Laserfiche WebLink
i <br /> ® b. The Water source and the water quality of that source. <br /> Irrigation water to be.provided by South San Joaquin Irrigation District. <br /> H. Monitoring and Maintenance: <br /> ® 1, Describe the monitoring and maintenance program that will be instituted to ensure that the proposed reclamation is <br /> successful and maintained: <br /> The landowner derives his livelihood'from the cultivation of the almond orchard. <br /> I. In-Stream Mining: <br /> ® 1. Describe the manner in which reclamation of the affected streambed channels and streambanks to a condition <br /> minimizing erosion and sedimentation will occur. <br /> NIA <br /> ® J. Future Mining: Explain how the proposed reclamation of this sitewill affect the potential for future mining at the site. <br /> No future grading of this site is anticipated. <br /> ® K. Public Safety:What measures will be taken to ensure public safety(e.g.fences,gates,slopes,signs or hazard removal)? <br /> Mow will the safety-measures be maintained? <br /> This proposed project will.not result-in-any public safety.issues. <br /> ❑ L. Other Information: Include any other information requested by the lead agency to ensure that adverse environmental effects <br /> are prevented or minimized and that the mined lands are reclaimed to a useable condition,which is readily adaptable for <br /> alternative land uses: <br /> III <br /> See enclosed photographs - <br /> Page 9 of 9 2006-20 Ag Ex Checklisf.doc <br />