My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006749
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VERITAS
>
8844
>
2600 - Land Use Program
>
PA-0700450
>
SU0006749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:42 AM
Creation date
9/9/2019 10:57:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006749
PE
2606
FACILITY_NAME
PA-0700450
STREET_NUMBER
8844
Direction
E
STREET_NAME
VERITAS
STREET_TYPE
AVE
City
MANTECA
APN
22613020
ENTERED_DATE
10/2/2007 12:00:00 AM
SITE_LOCATION
8844 E VERITAS AVE
RECEIVED_DATE
10/1/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VERITAS\8844\PA-0700450\SU0006749\APPL.PDF \MIGRATIONS\V\VERITAS\8844\PA-0700450\SU0006749\CDD OK.PDF \MIGRATIONS\V\VERITAS\8844\PA-0700450\SU0006749\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> .3 <br /> (4) Have an" average elevation no less{than -the average elevation of the natural grade of the <br /> surrounding land. The average elevation of the natural or existing grade shall be the average <br /> elevation'of all land 100 feet from the perimeter of the proposed excavation, excluding any <br /> portion -of the perimeter adjacent to a river, river-bank, levee, public road, railroad, canal, <br /> pipeline, or other similar uses or rights-of-way. <br /> ,w <br /> f. EROSION CONTROL:. Prote'ctiVe vegetative plating,`silt screen dams, or other approved methods <br /> shall be required where necessary for the control of erosion.' An erosion and sediment control plan <br /> approved by=Development.Sefvices Division shall be part of the reclamation'plan. (Development- <br /> Title Section.9-1410,3[m]) <br /> g.. HOURS OF.OPERATION: Excavation operations shall not be carried on during the hours from 9:00 <br /> p.m. thr6ugh5:00 a.m.'(Development Title Section 9-141 0.3[d)) <br /> , ' <br /> h." LIGHTING: Any night lighting established'on the property shall be arranged and controlled so as not <br /> to illuminate public rights-of-way or adjacent properties. (Development Title Section 9-1410.3[e]) <br /> "s, EMISSIONS- All emissions shall be' subject to the rules and regulations of the San Joaquin Valley <br /> Air Pollution Control District. (Development Title Section 9-1410.3[f]) <br /> j. WEED CONTROL: If noxious weeds are on the site, 'operations shall be in. accordance with <br /> instructions from the Agricultural Commissioner of-San=Joaquin County. (Development Title Section <br /> 9-1410.3[h]) <br /> k. HEALTH CONSIDERATIONS: Excavations shall not cause health or sanitary hazards and shall not <br /> create conditions which will cause the breeding or increase of mosquito's, rodents, or other pests" <br /> (Development Title Section 9-1410.3[i]) <br /> I. COMMENCEMENT OF WORK: A written notification of work schedules shall be provided to the <br /> County by the applicant prior to initiating any grading or excavation. (Development Title Section 9- <br /> 1410.3[j]) ' <br /> m. CERTIFICATAON OF COMPLIANCE: At the completion of the grading, the applicant shall have a <br /> registered civil engineer or'licensed surveyor compare the excavation's final elevations`with the <br /> approved pe:(mit.. The engineer or surveyor shall submit a certified, written finding'to the Building <br /> _Official which states and documents,the compliance or noncompliance of the excavation with the <br /> approved permit. If the project conforms with the approved permit, the Review Authority shall accept <br /> the certification and either notify the applicant that the stockpiled material may be removed or release <br /> the required performance guarantee. (Development Title Section 9-1410.3[k]) <br /> 3 <br /> n" EXCAVATIONIRECLAMATION SCHEDULE: The reclamation plan shall show the phases of <br /> excavation. Reclamation on one phase of an excavation shall be initiated prior to the start of the next <br /> excavation phase. The final reclamation of any phase of excavation shall be completed within two <br /> years of the commencement of the reclamation process. Excavation shall be limited so that at any <br /> .point`of time-,a maximum of one phase is being reclaimed while one phase is;being excavated. <br /> (Development Title Section 9-1.410.3[n]) <br /> o. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be conducted by the <br /> County to ensure compliance with the conditions of the permit and the reclamation'.plan. The County <br /> may use professional services as provided for in Section 9-240.11' The consultant shall be selected <br /> by San Joaquin County. Upon completion of the annual inspection, the person in charge of the <br /> mining operation shall submit to the State Geologist and the County a report which shall contain all <br /> the informO?n as required by Section 2207 of the Public Resources Code. The cost of the <br /> inspection shall be paid by the mine operator. Additional inspections may be conducted, but the cost <br /> Revised Conditions of Approval -2- r PA-0700450 <br />
The URL can be used to link to this page
Your browser does not support the video tag.