My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006749
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VERITAS
>
8844
>
2600 - Land Use Program
>
PA-0700450
>
SU0006749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:42 AM
Creation date
9/9/2019 10:57:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006749
PE
2606
FACILITY_NAME
PA-0700450
STREET_NUMBER
8844
Direction
E
STREET_NAME
VERITAS
STREET_TYPE
AVE
City
MANTECA
APN
22613020
ENTERED_DATE
10/2/2007 12:00:00 AM
SITE_LOCATION
8844 E VERITAS AVE
RECEIVED_DATE
10/1/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VERITAS\8844\PA-0700450\SU0006749\APPL.PDF \MIGRATIONS\V\VERITAS\8844\PA-0700450\SU0006749\CDD OK.PDF \MIGRATIONS\V\VERITAS\8844\PA-0700450\SU0006749\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i � <br /> f. EROSION.CONTROL: Protective vegetative planting,silt screendams; .or other approved methoft <br /> shall be required wFiere necessary for the control of erosion -An erosion and sedir,dnt,-contrgl,plan <br /> approved by Developrrient Services Division'Shall b`e part of the reclamation plan. (l]evelopmenf <br /> Title Section 9-1410.3[m]) <br /> g. 'HOURS OF OPERATION: Excavation.., .�-- -.. <br /> ,operatiren: ons er shall nat be carnedon-during the hours.from 9'00. <br /> P.M. through 5:00 a.m. (Devefoprnerittitle Section 9-1410.3[d]) <br /> -, t 4 <br /> h.` LIGHTING:,Any night lighting'established on theproperty shall be arranged and controlled sous not <br /> to illuminate public rights-of-way or adjacent properties: (Development Title Section 9=1410.3[6]) <br /> i. EMISSIONS: All remissions shall tie.subject to tlhe rules and regulations of the San Joaquin Valley <br /> Air Pollution Control District. (Development Title Section 971410.3[f]) = <br /> j. WEED CONTROL: If noxious weeds are ori,the'site' , operations shall be in accordance with <br /> instructions from the Agricultural Commissioner of San Joaquin County. (Development Title Section <br /> 9-1410.3[h]) <br /> k. HEALTH CONSIDERATIONS: Excavatio ns shall not cause health or sanitary hazards and shall not <br /> create conditions which will cause the breeding or increase of mosquito's,rodents, or other pests. <br /> (Development Title Section 9-1410,3[i]) <br /> I. COMMENCEMENT OF WORK: A written notification of work•schedules shall be provided to the <br /> County by the applicant prior to initiating any grading or excavation. (Development Title Section 9- <br /> 1410.3b)) <br /> m. CERTIFICATION OF COMPLIANCE: At the completion of the grading, the applicant shall have a <br /> registered civil engineer or licensed surveyor compare the excavation's final elevations with 'the <br /> approved permit. The engineer or surveyor shall submit a certified, written finding to the Building <br /> Official which states and documents the compliance or noncompliance of the excavation with the <br /> approved permit. If the project conforms with the approved permit, the Review Authority shall accept <br /> the certification and either notify the applicant that the stockpiled material may be removed or release <br /> the required performance guarantee. (Development Title Section,9-1410.3[k]) <br /> n. EXCAVATIONIRECLAMATION SCHEDULE: -The reclamation plan' shall show the phases of <br /> excavation. Reclamation on one phase of an excavation shall be initiated prior to the start of the next <br /> excavation phase. The final reclamation of any phase of excavation shall be completed within two <br /> years of the commencement of the reclamation process. Excavation shall be limited so that at any <br /> point of time a maximum of one phase is being reclaimed while one phase is being excavated. <br /> (Development Title Section 9-1410.3[n]) <br /> o. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be conducted by the <br /> County to ensure compliance with the conditions of the permit and the reclamation plan. The County <br /> may use professional services as provided for in Section 9-240:11. The consultant shall be selected <br /> by San Joaquin County. Upon completion of the annual inspection, the person in charge of the <br /> mining operation shall submit to the State Geologist and the County a report which shall contain all <br /> the information as required by Section 2207''of the Public Resources Code. The cost of the <br /> inspection shall be paid by the mine operator. Additional inspections may be conducted, but the cost <br /> of additional inspections shall be paid-for by-the mine operator only if on-compliance with the <br /> conditions of the Agricultural Excavation Permit or the reclamation plan is found. (Development Title <br /> Section 9-1410.3[o]) <br /> i <br /> Conditions of Approval - 2 - PA-0700450 ; <br />
The URL can be used to link to this page
Your browser does not support the video tag.