Laserfiche WebLink
P A . 0-0450 <br /> RECLAMATION PLAN <br /> This proposed agricultural excavation will'be completed-in two phases as shown <br /> on the Grading Plan. Each phase will take one yearto complete. The "Phase <br /> One" graded area will be planted in strawberries or other row.crops while the <br /> F "Phase Two"area is excavated. Upon completion of"'Phase Two", the entire <br /> property will-be planted in strawberries or other row crops for one year. The <br /> entire property will be planted with strawberries or other row crops for'a 3`d year. <br /> During the 4th year, the property willbeplanted in almonds as shown on.the <br /> Reclamation Site Plan. <br /> 2006-20 Rec Plan <br />