My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002185
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2600 - Land Use Program
>
UP-00-24
>
SU0002185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 8:43:18 AM
Creation date
9/9/2019 10:58:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002185
PE
2626
FACILITY_NAME
UP-00-24
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
10/23/2001 12:00:00 AM
SITE_LOCATION
17950 W VIA NICOLO RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\V\VIA NICOLO\17950\UP-00-24\SU0002185\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED CWC SECTION 13308 TIME SCHEDULE ORDER NO. R5-2002-4014-R01 9- <br /> MUSCO OLIVE.PRODUCTS AND THE STUDLEY COMPANY <br /> SAN JOAQUIN COUNTY <br /> construction of the pond and tailwater return system (Task No. 16), and.the.requirement to.cease <br /> discharge and/or ponding of waste to the surface water drainage course effective.15 July 2002 <br /> (Task No. 15). <br /> IT IS HEREBY ORDERED that, pursuant to Sections 13308 and 13267 of the California Water Code, <br /> Musco Olive Products and the Studley Company, its agents successors, and assigns, shall in accordance <br /> with the following tasks and time schedule, implement the following measures and the facility upgrades <br /> required to ensure long-term compliance with WDRs No. 97-037, or any revisions to those WDRs. <br /> Any person signing a document submitted under this Order shall make the following certification: <br /> t <br /> -1 certify under penalty oflaWthat I h_a_ve personally examined.and,am familiar:with the <br /> information submitted in this document and all attachments and that, based on myknowledgeand <br /> on my inquiry of those individuals immediately responsible for obtaining the information, 1 believe <br /> that the information is true, accurate, and complete. 1 am aware that there are significant <br /> penalties for submitting false information, including the possibility of fine and imprisonment. " <br /> 1. Effective 25 January 2002, the Discharger shall comply with all aspects of Revised Monitoring <br /> and Reporting Program (MRP)No. 97-037. Failure to submit complete monitoring reports shall <br /> result in a penalty of$2,500 per day in which a report is late or incomplete. <br /> 2. Beginning with the month of January..2002„the Discharger:shall submit monthly project status <br /> reports.• In addition to the information required by the Revised MRP,.the_reports,shall describe all <br /> work completed during the month.in response to this Time Schedule Order, and shall contain daily <br /> tabulations of the flow and DIS concentrations discharged to land. The reports shall also describe <br /> the work completed to date regarding the potential for source control or pretreatment activities <br /> (i.e.,bicarbonate removal equipment, the impact of increased sulfate concentrations on the crops <br /> and soil, the potential for converting to potassium hydroxide, the impact of increased potassium <br /> discharges on crops and soil), the status of obtaining permits for the storage pond, and the status of <br /> submitting a complete Report of Waste Discharge. Monthly status reports may be combined with <br /> the monthly reports required by the MRP and shall be submitted by the 1”day of the second <br /> month following the month for which the report was prepared (i.e., the January 2002 report is <br /> due by 1 March 2002)_The penalty shall'be $2,500 for—each day'in whicha report is late or <br /> incomplete. <br /> 3. Between 1 February and 6 June 2002, the 7-day average flow discharged to land shall not <br /> exceed 600,000 gpd. The daily maximum flow shall not exceed 750,000 gpd. The 7-day <br /> averaging period shall be for a calendar week, from Monday through Sunday. Each weekly or <br /> daily violation shall result in a penalty of$2,500 per day of violation. <br /> 4. Between 7 June and 6 September 2002, the,7-day average flow discharged to land shall not <br /> exceed 820,000 gpd. The daily maximum flow shall not exceed 950,000 gpd. The.7-day <br /> averaging period shall be for.a calendar week,-from Monday,through Sunday. Each weekly or <br /> daily violation shall result in a penalty of$2,500 per day of violation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.