My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002185
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2600 - Land Use Program
>
UP-00-24
>
SU0002185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 8:43:18 AM
Creation date
9/9/2019 10:58:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002185
PE
2626
FACILITY_NAME
UP-00-24
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
10/23/2001 12:00:00 AM
SITE_LOCATION
17950 W VIA NICOLO RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\V\VIA NICOLO\17950\UP-00-24\SU0002185\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Nater Quality Control Board <br /> QW; Central Valley Region <br /> Robert Schneider Chair 0 <br /> Winston 14.Hickox Gray Davis <br /> 5ecrelaryfor Sacramento Alain Office Governor <br /> Environntenial Internet Address: littp:/t%Ni%,%v..s.wTeb.ca.gov/—rwqcb5 <br /> Protection 3443 Routier Road,Suite A,5acraniento,.Califomia 95827-3003 <br /> Phone(9I6)2551-3000•FAX(9l G)255-3035 <br /> ORDER NO. R5-2002-0014-R01 <br /> ATTACHMENT A <br /> ITEMS TO BE INCLUDED IN A MONITORING WELL INSTALLATION WORKPLAN AND <br /> A MONITORING WELL INSTALLATION REPORT OF RESULTS <br /> Prior to installation of groundwater monitoring wells, the Discharger shall submit a workplan containing <br /> the minimum listed information. Wells may be installed after staff approve the workplan. Upon <br /> installation of the monitoring wells, the.Discharger shall submit a report of results, as described below. <br /> All-workplans and reports must-be signedby a registered geologist;certified engineering geologist;or <br /> civil engineer registered or certified by the State of California. <br /> E <br /> I. Monitoring Well Installation Workplan <br /> A. General Information: <br /> Monitoring well locations and rationale <br /> Survey details <br /> Equipment decontamination procedures <br /> Health and safety plan <br /> Topographic map showing any existing monitoring wells, proposed wells, waste handling <br /> facilities, utilities, and other major physical and man-made features. <br /> B. Drilling Details: describe drilling and logging methods <br /> C. Monitoring Well Design: <br /> Casing diameter <br /> Borehole diameter <br /> Depth of surface seal <br /> Well construction materials <br /> Diagram of well construction <br /> Type of well cap: <br />` Size of perforations and rationale <br /> Grain size of sand pack and rationale <br /> Thickness and position of bentonite seal and sand pack <br /> Depth of well, length and position of perforated interval <br /> D. Well Development: <br /> Method of development to be used <br /> Method of determining when development is complete <br /> Method of development water disposal <br /> E. Surveying Details: discuss how each well will be surveyed to a common reference point horizontal <br /> and vertical survey.data is required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.