Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> MS-91-20 <br /> PAGE 3 <br /> 4 . OAKDALE IRRIGATION DISTRICT <br /> Conditions of Approval <br /> a. Relocate approximately 1, 350-feet of Chappel Pipeline with <br /> 36-inch reinforced concrete pipe meeting ASTM C361 and O. I .D. <br /> specifications. <br /> b. Relocate approximately 1, 130-feet of Chappel Pipeline with <br /> 30-inch reinforced concrete pipe meeting ASTM C361 and O. I.D. <br /> specifications. <br /> C. Relocate four structures on Chappel Pipeline to O. I .D. <br /> standards. <br /> d. Install a new private distribution pipeline for property now <br /> irrigation from valves located on top of the Chappel Pipeline <br /> pursuant to Current O. I .D. policy. <br /> e. Provide O. I . D. easements as required. <br /> f. Provide necessary easements for private irrigation and <br /> drainage facilities. <br /> g. Replace bridge over Lone Tree Creek with one meeting O. I . D. , <br /> San Joaquin County and Escalon Fire District standards. <br /> h. Provide improvement plans for irrigation facilities to be <br /> constructed, including the bridge across Lone Tree Creek, to <br /> O. I .D. for approval. Said plans to be prepared by a licensed <br /> engineer. <br /> i. Provide O. I . D. with mylars of said improvement plans . <br /> j . Any work on O. I .D. facilities to be done between October 15, <br /> and March 1. <br /> k. Encroachment Permits will be required for any private <br /> facilities on O. I .D. easements. <br /> 1. Reimburse O. I .D. for improvements plan checking and inspection <br /> expenses. <br />