Laserfiche WebLink
conditions of Approval <br /> MS-92-120 <br /> Page 3 <br /> g. All easements of record shall be shown on the Parcel Map. <br /> (Development Title Section 9-910.20) <br /> h. Requirements for construction of improvements shall be <br /> noticed by a statement on the Parcel Map. (Subdivision <br /> Map Act Section 66411. 1) <br /> t <br /> 3 . PUBLIC HEALTH SERVICES: <br /> a. Connection to a public sewer system is required. <br /> (Ordinance Code Section 9-10002) <br /> b. Connection to an approved public water supply system is <br /> required. - A letter from the water supplier will be <br /> required stating that they have the capacity to serve the <br /> development and that the system meets State standards <br /> prior to approving the final map. <br /> C. On both parcels, open, pump, and backfill the septic <br /> tank, seepage pit or excavation under permit and <br /> inspection _ by , ithe : Environmental Health Division. <br /> (Ordinance Code Section 5-3003) <br /> d. Until Parcel 2 is connected to public sewers, the illegal <br /> discharge of the washing machine water on top of the <br /> ground must be stopped. connect to existing septic tank <br /> or remove washing machine from premises. <br /> e. On Parcel 2 , demolition of all dilapidated structure(s) <br /> and removal of all demolition material from premises to <br /> an approved landfill site in accordance with San Joaquin <br /> County Ordinance 2887 , Section 5-2401. <br /> 4. BUILDING INSPECTION DIVISION: <br /> a. All sewer connection, sewer tap and encroachment fees <br /> must be paid to the City of Stockton Public Works <br /> Department prior to the issuance of a Building Permit. <br /> If not already installed, provide separate sewer laterals <br /> for each newly created parcel. <br />