Laserfiche WebLink
a?`l4l.ry. <br /> 2� <br /> Le <br /> vtl.a o.w is <br /> SITE APPROVAL <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 EAST HAZELTON AVENUE, STOCKTON, CA 95205 <br /> TELEPHONE: (209) 468-3120 <br /> BUSINESS HOURS: 3:00 a.m. to 12 p.m. / 2:00 p.m. to 5:00 p.m. <br /> (Monday through Friday) <br /> APPLICATIONPROCESSING STEPS <br /> STEP CHECK WITH STAFF - Developmentservices SVHwill ex lam the equlrements and procedures to you. <br /> STEP 2 SUBMIT YOUR APPLICATION - Applications are acceptedby appointment oIY. call 4683120 for an <br /> appomlmenl- When you apply,file all of the following: <br /> • FEE The staff will let you know the current cost of filing an application. Make checks payable to the San <br /> Joaquin County Treasurer. <br /> • FORM Seven(7)copies of the completed application information forms(attached)which all owners must <br /> sign. <br /> • SITE PLAN Seven(7)copies of a folded Site Plan Isea attached)and two(2)copies of an 8-112' x ii"reduced <br /> copy of the plan. <br /> • HAZARDOUS One copy of a completed Hazardous Materials Disclosure Survey form(a copy of the farm is <br /> MATERIALS attached). <br /> • DEED '�� One copy of the recorded deed(s)of the property. <br /> • SERVICES If your project requires connection to public facilities,you must submit a'wdl-serve"letter from <br /> the appropriate water,sewer and drainage entities at the time of filing. This letter must include a <br /> statement from the agency that they will serve the proposed development.and has,or will have, <br /> the capacity to provide such services <br /> APPLICATION Stall will check your appllcation. If anything is missing,you will be notified in wri Ong. The <br /> COMPLETE applicant will be sent a postcard once the application has been determined completes Your <br /> application cannot be processed until it-is completeJ <br /> STEP 3 APPLICATION PROCESSING <br /> • CEOA The County will decide it the proposal will have an adverse effect on Ne environment If there are <br /> ria adverse effects, the application will be processed. If there are potential adverse effects, further <br /> anvironmental review will be required. Projecrs that have the potentlal to adversely affect the <br /> environment will require the preparation of an E.I.R- This may extend the processing time_ <br /> • REFERRALS AND StaHwiil refer the application to any Counry departments,other agencies and surrounding <br /> ACTION property owners affected by your proposal. At the end of a review and comment period the staff <br /> will approve your application if they can make required findings. If the staff cannot make the <br /> required findings, the application will be denied. Typically action will be taken on the project within <br /> ld weeks. <br /> • FINAL.ACTION The action of the stalfcan be appealed to the Planning Commission. The staffs action is final <br /> unless appealed. For further information an the len m of the aooeal period,contact the suit. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • CONDITIONS The stall will send you the final action and if it is approval it will list conditions,by department.that <br /> must be met before you Can start your project <br /> • IMPROVEMENT In addition to the Site Plan,an Improvement Plan is frequently required as a condition of approval. <br /> ?t�NS This is an engineered plan snowing drainage-grading,frontage improvements,access,on-and art- <br /> site service and utility facilities,landscaping and circuladonIparking devils. <br /> • DRIVEWAY Onveway Permits must be acquired from Community Development Department for any work <br /> PERMITS performed within the road ngnt of way. If the project fronts an a state hignway these permtb are <br /> obtamed from Caltrans. <br /> • SANITATION& Projects that will utilize new on-site sanitation disposal and/or onsite wells,must get permits from <br /> WELL PERMITS the Environmental Health Division. <br /> • BUSINESS If the projeC involves a business,a Business License must be approved prior!o starting <br /> UCENSES operation. Business License applications can be processed concurrently with tate Site Approval <br /> application. <br /> • BUILDING - -TiFfif a project involves construction a oudoing permit Must be approved prior to commencement or s <br /> PERMITS work. <br /> Y <br /> • OTHER PERMITS Frequently other local,state and/or federal agencies will require permits prior to new uses being <br /> established(e.g.Air Pollution Control Distract.Regional Water Quality Control Board or the <br /> Sheriffs Officel. The Community Development Department will identify additional permits we are <br /> aware of that may be required for your nroieR <br />