Laserfiche WebLink
i <br /> Thomas M. Gau x ,.,, =2- <br /> COMMENTS ON DEVELOPMENT y i <br /> - SA-98=32 <br /> - 4,r, <br /> 3. The Traffic Impact Mitigation Fee will be required for this approval development. The fee is due <br /> and payable at the time of improvement plan. The fee currently is$159.10 per additional daily, <br /> trip-end generated in the Stockton area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> - A credit for the existing use may be allowed if it is shown the facility was in service since <br /> April 23, 1990. ° <br /> (Resolutions R-90-304,R-91-1025, R-93-167,R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Improvement Pian shall be submitted prior to release of building permit. <br /> GK:RWH:gn <br /> < ' .Y:'.% <br /> E: Manuel Lopez,Deputy Director/Development <br /> V ! <br /> .,.. .. - _ A f <br /> ' Y � <br /> n. s <br />