Laserfiche WebLink
-3- <br /> Mo Hatef <br /> Community Development Deparhnent <br /> PA-1600263 (SA) <br /> 10. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 11. This project falls within the definition of a Priority Project as defined in either the County"Storm <br /> Water Quality Control Criteria Plan"(SWQCCP)or the County Phase I National Pollutant <br /> Discharge Elimination System(NPDES)permit and shall comply with the following conditions: <br /> a) A registered professional engineer shall design a system or combination of systems to <br /> treat,filter,or infiltrate the 85th percentile storm as defined in the County's 2009 <br /> SWQCCP. The system design shall follow standards as outlined in the 2009 SWQCCP <br /> or in the "California Association of Stormwater Quality Agencies"(CASQA) <br /> publications and comply with the conditions of the County Phase I NPDES permit. <br /> CASQA documents are available at http://www.casga.org <br /> b) Applicant shall submit a"Storm Water Pollution Prevention Plan"(SWPPP)to Public <br /> Works for review. A SWPPP preparation guide is available at the Department of Public <br /> Works. A copy of the approved SWPPP and all required records,updates,test results and <br /> inspection reports shall be maintained on the construction site and be available for review <br /> upon request. The post construction chapter of the SWPPP must identify expected <br /> pollutants and how they will be prevented from entering the storm system. The chapter <br /> shall also contain a maintenance plan,a spill plan,and a training plan for all employees <br /> on proper use,handling and disposal of potential pollutants.The example plans are <br /> available in the SWQCCP and CASQA handbooks. <br /> c) All Priority New Development and Significant Redevelopment Projects must meet the <br /> volume reduction requirement outline in the County's SWQCP 2009 available at <br /> http://sjcleanwater.org/LID.htm <br /> d) Proprietary storm drainage treatment devices used in any system shall be approved for <br /> use by a major California city, Caltrans,or the Washington State DOT and shall be the <br /> last resort of the developer to comply with the 2009 SWQCPPP. Latitude and <br /> Longitude of all treatment devices shall be obtained by use of a global positioning <br /> system and reported to the County.Property owner shall execute an agreement and <br /> record a deed restriction,in a form acceptable to the County,regarding maintenance <br /> and perpetuation of the installed systems.Property owner shall be responsible for the <br /> ongoing operation and maintenance of any system installed unless the system is <br /> accepted for maintenance by a government agency. <br /> e) Owner shall be responsible for providing the County with an annual report of operation <br /> and maintenance of any system.The property owner shall also be responsible for the <br /> payment to the County of an annual system inspection fee established by Resolution of <br /> the Board of Supervisors. <br /> f) A Maintenance Plan shall be submitted and the execution of a Maintenance Agreement <br /> with San Joaquin County will be required for the owner/operator of stormwater controls <br /> prior to the release of the building permit. <br /> g) Standard Best Management Practices for the type of development proposed shall be <br /> incorporated into the site storm drainage design. <br />