My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011185
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAUDMAN
>
1927
>
2600 - Land Use Program
>
PA-1600263
>
SU0011185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:01 AM
Creation date
9/9/2019 11:03:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011185
PE
2632
FACILITY_NAME
PA-1600263
STREET_NUMBER
1927
Direction
W
STREET_NAME
WAUDMAN
STREET_TYPE
AVE
City
STOCKTON
Zip
95209-
APN
08029039
ENTERED_DATE
1/13/2017 12:00:00 AM
SITE_LOCATION
1927 W WAUDMAN AVE
RECEIVED_DATE
1/13/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WAUDMAN\1927\PA-1600263\SU0011185\APPL.PDF \MIGRATIONS\W\WAUDMAN\1927\PA-1600263\SU0011185\CDD OK.PDF \MIGRATIONS\W\WAUDMAN\1927\PA-1600263\SU0011185\EHD COND.PDF \MIGRATIONS\W\WAUDMAN\1927\PA-1600263\SU0011185\EHD PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA-1600263 (SA) Project - 3 - 31 January 2017 <br /> San Joaquin County <br /> (SWPPP). <br /> For more information on the Construction General Permit, visit the State Water Resources <br /> Control Board website at: <br /> http://www.waterboards.ca.g ov/water_issues/prog rams/stormwater/constperm its.shtm I. <br /> Phase I and II Municipal Separate Storm Sewer System (MS4) Permits' <br /> The Phase I and II MS4 permits require the Permittees reduce pollutants and runoff flows <br /> from new development and redevelopment using Best Management Practices (BMPs) to <br /> the maximum extent practicable (MEP). MS4 Permittees have their own development <br /> standards, also known as Low Impact Development (LID)/post-construction standards that <br /> include a hydromodification component. The MS4 permits also require specific design <br /> concepts for LID/post-construction BMPs in the early stages of a project during the <br /> entitlement and CEQA process and the development plan review process. <br /> For more information on which Phase I MS4 Permit this project applies to, visit the Central <br /> Valley Water Board website at: <br /> http://www.waterboards.ca.g ov/centralvalley/water_issues/storm_water/m unicipal_permits/. <br /> For more information on the Phase II MS4 permit and who it applies to, visit the State <br /> Water Resources Control Board at: <br /> http://www.waterboards.ca.gov/water_issues/programs/stormwater/phase_ii_municipal.sht <br /> ml <br /> Industrial Storm Water General Permit <br /> Storm water discharges associated with industrial sites must comply with the regulations <br /> contained in the Industrial Storm Water General Permit Order No. 2014-0057-DWQ. <br /> For more information on the Industrial Storm Water General Permit, visit the Central Valley <br /> Water Board website at: <br /> http://www.waterboards.ca.g ov/centralvalley/water_issues/storm_water/industrial_general_ <br /> permits/i ndex.shtm I. <br /> Clean Water Act Section 404 Permit <br /> If the project will involve the discharge of dredged or fill material in navigable waters or <br /> wetlands, a permit pursuant to Section 404 of the Clean Water Act may be needed from the <br /> United States Army Corps of Engineers (USACOE). If a Section 404 permit is required by <br /> the USACOE, the Central Valley Water Board will review the permit application to ensure <br /> that discharge will not violate water quality standards. If the project requires surface water <br /> ' Municipal Permits=The Phase I Municipal Separate Storm Water System (MS4) Permit covers medium sized <br /> Municipalities(serving between 100,000 and 250,000 people)and large sized municipalities (serving over <br /> 250,000 people). The Phase 11 MS4 provides coverage for small municipalities, including non-traditional Small <br /> MS4s,which include military bases, public campuses,prisons and hospitals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.