Laserfiche WebLink
Yes No <br /> b. will the project impact any rare , <br /> endangered, or recreational species <br /> located on or near the site? x <br /> q . Air : <br /> Will the project result in deterioration of <br /> existing air quality , including creation of <br /> objectionable odors ; will future project <br /> residents be subjected to significant <br /> pollution levels? X <br /> 5 . Noise : <br /> a . Will the project expose people to high <br /> noise or vibration levels? X <br /> b. will the project result in increased <br /> noise or vibration levels? x <br /> 6 . Energy/Natural Resources/Hazards ( consider <br /> the General Plan ) : <br /> a . Will the project result in any signifi- <br /> cant consumption of energy? X <br /> b. Will the project affect the potential <br /> use, extraction , conservation , or <br /> depletion of a natural resource other <br /> than agricultural land? X <br /> c . will the project create a risk of <br /> explosion, release or exposure to <br /> hazardous substances , or other <br /> dangers to public health and safety? x <br /> 7 . utilities and Public Service : <br /> *a . will the project require alteration of , <br /> addition to , or the need for utility <br /> systems - water , sewer , drainage, solid <br /> waste - including sphere of influence or <br /> district boundary change? X <br /> *b. Will the project result in the need for <br /> or the expansion of the following services : <br /> fire and police protection, schools , parks <br /> and recreation, roads , flood control or <br /> other public works facilities , public <br /> transit , or governmental services? X <br /> *"Yes " answers to these questions will require additional discussion, <br /> but do not necessarily indicate a potentially significant impact . <br /> Initial Study _ - 3 - ( 6-88 ) <br />