Laserfiche WebLink
GEOSYNTEC CONSULTANTS <br /> Ms. Amy Terrell <br /> 6 July 2005 <br /> Page 4 <br /> FUTURE WORK <br /> Combined groundwater monitoring and Remediation Pilot Study Monitoring will <br /> be performed in August 2005 and reported by 1 November 2005. If you have any <br /> questions or comments, please call Nancy Bishop, Manager Environment, Health & <br /> Safety for WFS at (925) 283-0353 or either of the undersigned at (510) 836-3034. <br /> Sinc ely, <br /> �OfESS1ergio antos, E. . . <br /> Jg� O Staff Engineer <br /> No.Ge653� O 'er^^ ? &e' <br /> ro�3 <br /> ♦ Susan H. Skoe, P.E. <br /> Project Engineer <br /> Copy w/attachments to: <br /> Ms. Nancy Bishop, WFS <br /> Mr. Harlin Knoll, San Joaquin County Environmental Health <br /> Attachments: <br /> Table 1 Groundwater Level Summaries <br /> Table 2 Geochemical Parameters Data Summary <br /> Figure 1 Site Location Map <br /> Figure 2 Site Map <br /> Attachment 1 Blaine Tech Field Report <br /> Attachment 2 Keystone Laboratory Analytical Data Report <br /> P:\PRJ2003REM\WFS\VER\MONG\2QO5\2Q2005.dm <br /> u xccuv..occwwee � �i <br />