Laserfiche WebLink
GEoSymmc CONSULTANTS <br /> Ms. Amy Terrell <br /> 18 November 2004 <br /> Page 7 <br /> FUTURE WORK <br /> Routine groundwater monitoring will continue in the I" quarter 2005. Quarterly <br /> monitoring associated with the HRC pilot scale test will be performed in the 4h quarter <br /> 2004. If you have any questions or comments, please call Nancy Bishop, Manager <br /> Environment, Health & Safety for WFS at (925) 283-0353 or either of the undersigned <br /> at (510) 836-3034. <br /> Sincerely, <br /> ��gtyNPL lac Susan Skoe, P.E. <br /> �� a aGlsr N� E e �� <br /> No.JB9 <br /> CERTIFIED <br /> Carolyn Kneiblher, C.HG. <br /> 9TFOFCp6�F0Q, Associate Hydrogeologist <br /> Copy w/attachments to: <br /> Ms. Nancy Bishop, WFS <br /> Mr. Harlin Knoll, San Joaquin County Environmental Health <br /> _ Attachments: <br /> Table 1 Monitoring Well Construction Summary <br /> Table 2 Groundwater Level Summaries <br /> _ Table 3 Analytical Data Summary <br /> Table 4 Geochemical Parameters Data Summary <br /> Figure 1 Site Location Map <br /> Figure 2 Site Map <br /> Figure 3 Analytical Results and Groundwater Elevation Contour Map - <br /> 31 August 2004 <br /> Figure 4 Analytical Results and Groundwater Elevation Contour Map - <br /> 31 March 2004 <br /> Figure 5 Groundwater Elevations versus Time <br /> P:\PRJ2003RENAWFS\VER\MONF\3QO4\WC04G66.do <br />