Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-0700191 <br /> The Home Church <br /> Site Approval Application No. PA-0700191 was approved by the San Joaquin County Planning <br /> Commission on September 6, 2007. The effective date of approval is September 16, 2007. This <br /> approval will expire on March 17, 2007, which is 16 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1 COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Rick Griffin, 468-3154) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for a K-8 private school for 264 students as shown on the Site <br /> Plan dated April 16, 2007. <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to the <br /> initiation of the use. (Section 7-1000 of the County Ordinance Code) <br /> e. STORM DRAINAGE: Storm water drainage shall be retained on the site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included (Development Title Section 9- <br /> 1135) <br /> f. PARKING: Off-street parking stall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and (asphalt concrete) (chip seal) or <br /> Portland cement concrete to provide a durable, dust free surface. Bumper guards shall be <br /> provided when necessary to protect adjacent structures or properties. (Development Title <br /> Section 9-1015.5[ej) <br /> (2} A minimum of sixty-one (61) parking spaces shall be provided, Including three (3) accessible <br /> spaces. one of which shall be van accessible The number of existing parking spaces meets this <br /> requirement. No new parking spaces are required. Accessible spaces shall be located as close <br /> Conditions of Approval - 1 - PA-0700191 <br />