Laserfiche WebLink
Holding Tank #2 <br /> This tank will consist of 4" ABS pipe connected from the washer, <br /> bathrooms, baptistry and fountain stub out. There will be 150' of <br /> pipe graded down at 1/4" per foot between this stub out and the <br /> inlet of the second holding tank of 2,000 gallons <br /> Both tanks will be approximately 6' under finished grade. A 24" diameter pipe with <br /> sealed lid will connect surface to access the lid on the tanks. <br /> Waste Water pumping: Both tanks will be pumped by a waste water pumping contractor <br /> periodically and regularly as deemed necessary. <br /> Enclosed you will find the following documents and plans: <br /> Page 1 and 2 - Details of Water Waste Treatment Plan for THC <br /> Page 3 and 4 - Copy of letter from CRWQCB. <br /> Page 5 - 8 1/2 x 11 site plan (details) <br /> Page 6 - 11 x 17 Master Plan <br /> Page 7 - Letter from water waste hauler <br /> May I add, on a personal note, how grateful we are to each one at the SJCEH depart- <br /> ment that have been so helpful in assisting us in acquiring this. I know many families <br /> who will be made stronger at this facility. <br /> Sincerely <br /> La <br /> im Pollock <br /> TPA rp <br /> Enclosures <br />