July 28.zoo< <br /> Page d All levels were cons,ed to be in the normal range for churcrte's according to Dave Welch, <br /> Pa <br /> Engineer for Neil Anderson and Associates. See attatchment. <br /> 7. PROPOSED TEMPORARY WASTE WATER SYSTEM DESIGN <br /> Phase I - An interim septic tank system.Building I (muti-purpose) and future Building 2 (learning <br /> center) <br /> Overview -4" lines gravity fed into two standard 1900 gallon tanks with the effluent <br /> pumped to a distribution box and (5) 100' leach lines with a 2' x 6' x 8'sump at the end of <br /> each line. See architectural design in appendix. <br /> Phase 2 - Single family residence <br /> Overview - Standard, single residence waste water system design. <br /> Phase 3 - Sanctuary and allother future buildings <br /> Overvie - A package treatment system or connection to city sewer. <br /> 8. CONCLUSION <br /> We have had a unique opportunity to actually track our water use because of the <br /> available holding tank. The actual gallons per person/per day is, in fact, very low <br /> (only 3 ounces). Possible reasons for this low figure are as follows: <br /> 1. We provide waterless hand washing substitutes on the counters next <br /> to the lavatories. <br /> 2. Typically, we don't have many full-service, food related events. (usually only <br /> two or three large functions in a year). <br /> 3. Low water usage equipment has been installed throughout the building. <br /> 4. There is 1 day where the usage is heavier than others,Sunday, but the average is calculat- <br /> ed on 7 days a week. If we take an amount of 600 people (average for a sunday) then the <br /> PPPD is 1.7 gals . <br />