Laserfiche WebLink
%.001 <br /> L <br /> Hilvers Residence <br /> April 26, 1993 <br /> Page 6 <br /> V <br /> 'r INVESTIGATION LIMITATIONS <br /> Our investigation was performed using the degree of care and skill ordinarily <br /> exercised, under similar circumstances, by reputable Soils Engineers and Geologists <br /> practicing in this or similar localities. No other warranty, expressed or implied, is <br /> made as to the conclusions and professional advice included in this report. <br /> The samples taken and used for testing and the observations made are believed <br /> representative of the entire project; however, soil and geologic conditions can vary <br /> •.• significantly between boreholes and surface exposures. As in most major projects, <br /> conditions revealed by excavation may differ from those identified in preliminary <br /> explorations and findings. If this occurs, the changed conditions must be evaluated <br /> i6a by the Project Soils Engineer and Geologist and the designs adjusted as appropriate <br /> or alternate designs recommended. <br /> This report is issued with the understanding that it is the responsibility of the <br /> owner, or of his representatives, to ensure that the information and <br /> recommendations contained herein are brought to the attention of the architect and <br /> engineer for the project and incorporated into the designs and plans, and the <br /> necessary steps are taken to assure that the contractor and subcontractors carry <br /> out such recommendations in the field. <br /> The findings of this report are valid as of the present date. However, changes in <br /> the conditions of a property can occur with the passage of time, whether they be due <br /> to natural processes or the works of man on this or adjacent properties. In addition, <br /> changes in applicable or appropriate standards may occur, whether they result from <br /> legislation or the broadening of knowledge. Accordingly, the findings of this <br /> report may be invalidated wholly or partially by changes outside our control. <br /> Therefore, this report is subject to review and should be updated after a period of <br /> ,,. three years. <br /> Respectfully submitted, <br /> CONSTRUCTION TESTING AND ENGINEERING, INC. - MODESTO <br /> v6�j edz'-V1 �U <br /> Wf'/V-a <br /> Rodney D. Ballard Vincent J. atula <br /> RCE #C043345 Qpor-Esg/o Project Geologist <br /> VJPlamk <br /> geo193-4014 UO.Co4a345 z' <br /> EXP.Pc- <br /> TFOf CALIT' <br /> a.� <br />