Laserfiche WebLink
APPLICATION - AGRICULTURAL EXCAVATION <br /> ei�G SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: PA- <br /> RECLAMATION PLAN <br /> CHECKLIST-CONTINUED <br /> [ ] H. Land Use: Describe the current land use(s)of the project site(e.g.,agriculture,timber,open space,recreation,etc.). <br /> [ ] I. Aesthetics: Discuss the visual impact of the proposed mining operation from adjacent vantage points. <br /> [ ] J. Other Information: Include any other information requested by the lead agency to assess the environmental impacts of the <br /> proposed operation. <br /> II. DESCRIPTION OF PROPOSED MINING OPERATION <br /> [X] A. Map of Operations: On a map,show details of the proposed mining operation including the following applicable features: <br /> property/permit boundaries ore stockpile areas <br /> topsoil stockpile areas tailings ponds <br /> siltation ponds buildings <br /> leach pads pits (slope crest/toe and benches) <br /> haul roads waste/overburden dumps processing facilities <br /> hazardous materials storage areas other pertinent features <br /> IN B. Production Schedule: Provide a table of estimated annual production of ore/product and overburden/waste. If mining will <br /> be phased, specify quantities by phase. The annual estimated quantities should be summed to give the total anticipated <br /> production for the life of the mine. <br /> [X] C. Mining Plan: A description of how mining will be done, including any or all of the following: <br /> [X] 1. Operating Plan: Provide the proposed initiation and termination dates of the mining operation. If seasonal, provide <br /> the proposed annual months of operation. <br /> 2. Topsoil: Describe: <br /> [X] a. Stripping and handling techniques. <br /> [X] b. Location and volume of proposed soil stockpiles. <br /> [X] c. How soil stockpiles will be protected from erosion(e.g., revegetated). <br /> 3. Overburden/Waste/Ore: Describe: <br /> [X] a. The proposed type of mine(open pit, quarry,placer,dredge,etc.). <br /> [X] b. The type/size of mining/hauling equipment to be used. <br /> [ ] c. The use, handling,and storage of explosives. <br /> [ ] d. The proposed method for removing overburden and ore. <br /> [X] e. The maximum anticipated depth of the mine. <br /> [X] f. The maximum depth of mining, bench width,and maximum slope angles(illustrate with cross sections). <br /> [X] g. If mining will be phased,describe each phase and concurrent reclamation. <br /> [ ] 4. Mine Waste: Most of the concerns relating to the discharge of mine waste can be satisfied by appending a copy of the <br /> report of waste discharge and waste discharge permit to the reclamation plan. <br /> F:\DEVSMPlanning Application Forms\ Page 9 of 15 <br /> Agricultural Exr vation.doc.(Revised 02-03-10) <br />