Laserfiche WebLink
Q: <br /> p4U`" z APPLICATION - AGRICULTURAL EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: PA- <br /> 9�rFORN <br /> O nets of mineral rights <br /> Name: Address:f 2$•s 1.4 /LGp G� Phone:(2o��y '�lql <br /> STDGKTd 0 G¢ 9 5206 Phone: <br /> Name: Address: <br /> Operator <br /> Name:/= -6,Mar-jel,gls TAk- Address: 0f3ox / TD? 401 Cit 192Y Phone(10033y -Z//L <br /> Name: Address: Phone: <br /> Agent of process (person designated by operator as agent for the service process) <br /> Name: Z Z2 CoSJn -1-JCC R / 3 <br /> J��iJ�N fwaNsa.v Addres . 1 Phon . 209) (,(�Z yl8 <br /> REQUIREMENTS AND STANDARDS <br /> The following requirements must be met by any approved Agricultural Excavation: <br /> • Slopes: For a complete discussion on slope requirements,see the San Joaquin County Development Title. <br /> • Hours of Operation: Excavation operations shall not be carried on during the hours from 9:00 p.m.through 5:00 a.m.,except during <br /> periods of declared national, state or local emergency. Said hours are based on either Pacific Standard Time or Pacific Daylight <br /> Saving Time,whichever is legally in effect. (Note: The hours of operation may be modified by the review authority based upon the <br /> excavation's potential effect on surrounding land uses. <br /> • Lighting: Any night lighting established on the property must be arranged and controlled so as not to illuminate public rights-of-way or <br /> adjacent properties. <br /> • Air Pollution Control: All emissions are subject to the rules and regulations of the San Joaquin County Air Pollution Control District. <br /> • Topsoil Replacement: During the excavation,the topsoil must be set aside. Upon completion of an excavation,the topsoil shall be <br /> replaced and the site leveled in conformance with the Reclamation Plan. (Note: This requirement may be waived if a soils report <br /> indicates the replacement of the topsoil will not enhance the agricultural suitability of the property. In such cases,the topsoil may be <br /> removed from the site.) <br /> • Weed Control: Operations shall be in accordance with instructions from the Agricultural Commissioner to control the spread of <br /> noxious weeds. <br /> • Health and Vector Control: The excavation must not cause health or sanitary hazards and shall not create conditions which will cause <br /> the breeding or increase of mosquitoes, rodents or other pests. <br /> • Reclamation: The reclamation of each phase shall be completed in conformance with the reclamation plan within two years of <br /> completion of the extraction portion of that phase. (Note: Reclamation shall be completed as soon as feasible. The schedule for <br /> reclamation will be a part of the approval of the excavation. It will define each phase of the excavation. The phases may be based on <br /> the sequence in which individual areas are to be excavated and reclaimed,or on the sequence in which various operations are to be <br /> carried out on each area of the excavation. In either case,the reclamation schedule shall clearly state the operations to be carried out <br /> in each area during each phase.) <br /> • Annual Inspection: The applicant must pay a fee to the County to cover the cost of an annual inspection of the excavation to assure <br /> compliance with the provisions of the permit. <br /> • Performance Guarantee: A specific condition on performance guarantee is required to ensure reclamation of the site and compliance <br /> with conditions of approval. The amount of the guarantee is and will be fully in force during the life of the permit. The estimated cost <br /> of reclaiming the site shall be reviewed annually by the Development Services Division. The type of financial guarantee proposed by <br /> the applicant under this Section must be found acceptable by County Counsel. The financial guarantee shall be made payable to <br /> "San Joaquin County and the Department of Conservation". The type of financial guarantee shall be one of the following: <br /> a) Surety bond, <br /> b) Irrevocable letters of credit, <br /> C) Trustfund. <br /> F:\DEVSMPlanning Application Forms\ Page 5 of 15 <br /> Agricultural Excavation.dm.(Revised 02-03-10) <br />