Laserfiche WebLink
f. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br />shall be required where necessary for the control of erosion. An erosion and sediment control plan <br />approved by Development Services Division shall be part of the reclamation plan. (Development Title <br />Section 9-1410.3[m]) <br />g. HOURS OF OPERATION: Excavation operations shall not be carried on during the hours from 9:00 <br />p.m. through 5:00 a.m. (Development Title Section 9-1410.3[d]) <br />h. LIGHTING: Any night lighting established on the property shall be arranged and controlled so as not <br />to illuminate public rights-of-way or adjacent properties. (Development Title Section 9-1410.3[e]) <br />i. EMISSIONS: All emissions shall be subject to the rules and regulations of the San Joaquin Valley Air <br />Pollution Control District. (Development Title Section 9-1410.3[f]) <br />j. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance with <br />instructions from the Agricultural Commissioner of San Joaquin County. (Development Title Section <br />9-1410.3[h]) <br />k. HEALTH CONSIDERATIONS: Excavations shall not cause health or sanitary hazards and shall not <br />create conditions which will cause the breeding or increase of mosquito's, rodents, or other pests. <br />(Development Title Section 9-1410.3[i]) <br />I. COMMENCEMENT OF WORK: A written notification of work schedules shall be provided to the <br />County by the applicant prior to initiating any grading or excavation. (Development Title Section 9- <br />1410.3[j]) <br />m. CERTIFICATION OF COMPLIANCE: At the completion of the grading of the project site, the applicant <br />shall have a registered civil engineer or licensed surveyor compare the excavation's final elevations <br />with the approved Improvement Plan. The engineer or surveyor shall submit a certified, written finding <br />to the Building Official which states and documents the compliance or noncompliance of the excavation <br />with the approved Improvement Plan. If the project conforms with the approved Improvement Plan, <br />the Review Authority shall accept the certification and either notify the applicant that the stockpiled <br />material may be removed or release the required performance guarantee. (Development Title Section <br />9-1410.3[k]) <br />ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be conducted by the <br />County to ensure compliance with the conditions of the permit and the reclamation plan. The County <br />may use professional services as provided for in Section 9-240.11. The consultant shall be selected <br />by San Joaquin County. Upon completion of the annual inspection, the person in charge of the mining <br />operation shall submit to the State Geologist and the County a report which shall contain all the <br />information as required by Section 2207 of the Public Resources Code. The cost of the inspection <br />shall be paid by the operator. Additional inspections may be conducted, but the cost of additional <br />inspections shall be paid for by the operator only if non-compliance with the conditions of the <br />Agricultural Excavation Permit or the reclamation plan is found. (Development Title Section 9- <br />1410.3[o]) <br />o. PERFORMANCE GUARANTEE: In order to ensure reclamation of the site, compliance with <br />conditions of approval, and compliance with County and state mining regulations, the applicant shall <br />provide performance guarantees as a condition of the issuance of the Agricultural Excavation Permit. <br />The amount and form of the guarantee shall be subject to annual review and approval by the County <br />and the state, and the amount shall be adequate to ensure reclamation of disturbed land and/or land <br />to be disturbed during a given phase. The annual review of the financial guarantee shall be <br />coordinated with the annual inspection and approval of successive reclamation security so that the <br />guarantee includes the amount of disturbed land plus the amount of land estimated to be disturbed <br />during the next 12 months, less the amount of land previously determined by Development Services <br />Division annual inspection to have been reclaimed. The performance guarantee shall be in the form <br />PA -1800301 —Conditions of Approval 2 <br />