Laserfiche WebLink
NOTES. <br />1. PRIOR TO EXCAVATION. CONTRACTOR SHALL REIDVERIFYLOCAlm <br />AND DEPTH OF EXISTING PIPELINE WITHIN THE BORROWSITE. SPECt9L. <br />CARE MUST BE MADETO PROTECT 111E PIPE NFLACEANDTONWT <br />DISRUPT SERV <br />2. NO HAZARDOUS MATERIALS SHALL BEICE" ONSIM - <br />3. IF MATERIAL IS STOCKPILED AT DESIGNATED STOCKPILELOCATIM, <br />WADDLESHAIIBE NSTALLED AROUNDTHEPERIMETERGF11E <br />STOCKPILE <br />4. AROCKCONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED ATTIE <br />TRUCK EXIT TO MINIMIZE TRACK OUT, AND IF NESESSARYA STREET <br />SW EEPERSMLBEUTIUZED. <br />S AFN'S: SORROWSITE191d10T00d00 <br />STOCKPILEAREA1914ID080000 <br />S. ZONING: AGM <br />7. GENEWFIAN: OSRC <br />B. NO WASTE DISCHARGE OF MATERIALS Wil OCCURONSRE. <br />9. WATERTRUCNS WILL BE USED ASA DUST SUPPRESSANTON INTERIM <br />HAUL ROADS, EXCAVATION AREA, AND STOCKPIIEAREA <br />10. EXCAVATED MATERIAL I5 ESTIMATED TO BE 97,000 CUBICYARDS. <br />OVERALL DURATION TO REMOVE MATERIAL IS ESRMAIED TO BEAT <br />LEAST2YEARS, <br />11. NOSTOCKPIUMSOILORMATERIALSHALL BEPLACEDCLDSERTHANE <br />FEET TO A PROPERTY UNE. <br />VICINITY MAP <br />SCALE:NT5. <br />FfG 44QUES SITE <br />AOUIN COUNTY, CNE <br />BASE MAP <br />91 <br />- APN,191-040O1i6-000 - = " <br />- <br />BO' ELECRLC7RANSMISSIONuNEEISEMBl1 <br />30' IRRIGATION AND DRAINAGE PIPELINES EASEMENT- <br />BSEtECTNICTRAN5M15510NL1NEFhSEMENI <br />N <br />1SWIDEHALLROAD <br />MIN 7S`IO PROPERTYUNE� ..'� <br />WIDEHAULROAD -LP <br />� <br />- { <br />-STOCIPILEAkEA T '`✓� <br />(SEENOTE tit <br />I <br />MIN T6T(LPROPEfTfYLIN�' <br />FfG 44QUES SITE <br />AOUIN COUNTY, CNE <br />BASE MAP <br />91 <br />