My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005911 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
11070
>
2600 - Land Use Program
>
PA-0600021
>
SU0005911 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:53 AM
Creation date
9/9/2019 11:09:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0005911
PE
2622
FACILITY_NAME
PA-0600021
STREET_NUMBER
11070
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01723018
ENTERED_DATE
2/8/2006 12:00:00 AM
SITE_LOCATION
11070 E WOODBRIDGE RD
RECEIVED_DATE
2/7/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WOODBRIDGE\11070\PA-0600021\SU0005911\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thi Water Was <br /> t=ted-b5,Fa for DBCP and Nitrates and the results were: <br /> BCP c0 flI ug/L a Q_0 mg/L <br /> sample meets rnia water standards.There is no third party involved in <br /> the sampling/testing of the well water,hence no chain of title. The test results and a sampling log <br /> are included in this report' <br /> SOM PROFILE FORMATION <br /> a _ <br /> No pit is dug to determine the soil profile,as the profile is determined by observing the soil <br /> removed and the rate of drilling. The soil profile as compiled from the 3 parcels is as follows: <br /> 0-3'Dark Clay,moist. <br /> 3'-8`Si.Sd.Ci. <br /> 8'-1 I'Hard Pan <br /> 11'- I8'Sand <br /> 18`-20`Dense Si.Sd.CI <br /> 20'-24'Clay <br /> 24'-25`Sand <br />!f <br /> f <br /> PERCOLATION TEST INFORMATION <br /> M The test holes for the 3 parcels are plotted on the TPM. A shallow(42")and deep(25 were <br /> agured on each parcel,as a minimum. The TPM shows three parcels with ties to each test hole. <br /> Parcels tested as follows: Parcel 1 - 5/17106,Par. 2-4/25/06, Par. 3 -6/20/06 . <br /> Each of the holes to be tested were prepared per SIC Policy EHD 02-02.The 24 hour soak began <br /> the day before the 4 hour testing procedure_The holes were dry. The test hole sleeving was <br /> completed as soon as possible after the drilling.Two inches of small gravel was placed m the <br /> bottom of the holes prior to placement of the PVC sleeving.(See sketch by Smith&Assoc of <br /> hole preparation)Then additional gravel was placed around the sleeving. <br /> l + <br /> Parcels tested/passed as follows: Parcel 1 - 5/17/06, Par. 2 -4/25/06,Par. 3 -6/20/06 <br /> f <br /> The field test forms show the readings. All three parcels require 6,000 SF of Leach Field Area. <br /> The subject site has two numbers as follows: PA 06-21 and PA 06-22, however there is only one <br /> Tentative Parcel Map and is included in each of the two reports <br /> 2. k <br /> I .� <br />
The URL can be used to link to this page
Your browser does not support the video tag.