Laserfiche WebLink
09/21/2005 11:29 20933326999 WAGEHHOFFER PAGE 02 <br /> page 2of2 <br /> We are concerned that the proposed project, with it's 8" wall, would further worsen <br /> our problem if (and when) we are flooded again. If this project is to go forward, we <br /> ask that the Supervisor and other County officials, create adequate drainage for us <br /> in case of flooding. We suggest that the developers of the proposed project, install <br /> drainage to the river to alleviate inherent drainage problems. <br /> Please address these problems and present solutions before allowing the proposed <br /> project to advance_ <br /> Sincerely, A/ 17,0 <br /> / <br /> Gus Wagenhoffer Ruth Wagenhoffer <br /> 4775 E. Woodbridge Rd. <br /> Acampo, CA 9520 <br /> 209--3344600 <br /> cc: Supervisor's office <br /> State Water Quality Control Board <br />