My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005344
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
4620
>
2600 - Land Use Program
>
PA-0500531
>
SU0005344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:05:00 AM
Creation date
9/9/2019 11:11:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005344
PE
2627
FACILITY_NAME
PA-0500531
STREET_NUMBER
4620
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
APN
01709002
ENTERED_DATE
8/26/2005 12:00:00 AM
SITE_LOCATION
4620 E WOODBRIDGE RD
RECEIVED_DATE
8/26/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\W\WOODBRIDGE\4620\PA-0500531_PA-0300206\SU0005344\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW <br /> WASTE DISCHARGE REQUIREMENTS ORDER NO.R5-2003-0099 12 <br /> NEWPORT PACIFIC CAPITAL COMPANY,INC. <br /> ARBOR MOBILE HOME PARK WASTEWATER TREATMENT FACILITY <br /> SAN JOAQUIN COUNTY <br /> recommendations concerning engineering and geology shall be prepared by or under the <br /> direction of appropriately qualified professional(s), even if not explicitly stated. Each <br /> technical report submitted by the Discharger shall contain a statement of qualifications of the <br /> responsible licensed professional(s) as well as the professional's signature and/or stamp of <br /> the seal. <br /> 3. The Discharger shall comply with the Monitoring and Reporting Program No. <br /> R5-2003-0099,which is part of this Order, and any revisions thereto as ordered by the <br /> Executive Officer. <br /> 4. The Discharger shall comply with the Standard Provisions and Reporting Requirements for <br /> Waste Discharge Requirements", dated 1 March 1991, which are attached hereto and made <br /> part of this Order by reference. This attachment and its individual paragraphs are commonly <br /> referenced as "Standard Provision(s)." <br /> 5. The Discharger shall use the best practicable treatment and control techniques, including <br /> proper operation and maintenance, to assure compliance with terms of this Order. <br /> 6. In event of overflow from the collection system, the Discharger shall take all necessary <br /> remedial action to control and limit the volume of wastewater discharged, and terminate the <br /> overflow as rapidly as possible. Necessary remedial actions may include,but are not limited <br /> to, the following: <br /> a. Interception and rerouting of sewage flows around the collection line failure; <br /> b. Vacuum truck recovery to the extent practical of sanitary sewer overflows and wash <br /> down water; <br /> c. Cleanup of sewage-related debris at the overflow site; <br /> d. Disinfection and posting of the area. <br /> 7. The Discharger shall report to the Regional Board any toxic chemical release data it reports <br /> to the State Emergency Response Commission within 15 days of reporting the data to the <br /> Commission pursuant to section 313 of the"Emergency Planning and Community Right to <br /> Know Act of 1986." <br /> 8. The Discharger shall not allow waste-free wastewater to be discharged into the wastewater <br /> collection, treatment, and disposal system. Waste-free wastewater means rainfall (roof <br /> gutters, yard drainage), groundwater, cooling waters, and condensates that are essentially free <br /> of wastes. <br /> 9. The Discharger shall submit to the Regional Board on or before each compliance report due <br /> date, the specified document or, if appropriate, a written report detailing compliance or <br /> noncompliance with the specific schedule date and task. If noncompliance is being reported, <br /> then the Discharge shall state the reasons for such noncompliance and provide an estimate of <br />
The URL can be used to link to this page
Your browser does not support the video tag.