My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005344
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
4620
>
2600 - Land Use Program
>
PA-0500531
>
SU0005344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:05:00 AM
Creation date
9/9/2019 11:11:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005344
PE
2627
FACILITY_NAME
PA-0500531
STREET_NUMBER
4620
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
APN
01709002
ENTERED_DATE
8/26/2005 12:00:00 AM
SITE_LOCATION
4620 E WOODBRIDGE RD
RECEIVED_DATE
8/26/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\W\WOODBRIDGE\4620\PA-0500531_PA-0300206\SU0005344\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> Robert Schneider,Chair <br /> Winston H.Hickox Gray Davis <br /> Secretary for <br /> Sacramento Main Office Governor <br /> Environmental Internet Address: http://www.swrcb.ca.00v/—rwgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> ORDER NO. 115-2003-0099 <br /> ATTACHMENT C <br /> ITEMS TO BE INCLUDED IN A MONITORING WELL INSTALLATION WORKPLAN AND <br /> A MONITORING WELL INSTALLATION REPORT OF RESULTS <br /> Prior to installation of groundwater monitoring wells, the Discharger shall submit a workplan containing <br /> the minimum listed information. Wells may be installed after staff approve the workplan. Upon <br /> installation of the monitoring wells, the Discharger shall submit a report of results, as described below. <br /> All workplans and reports must be signed by a registered geologist, certified engineering geologist, or <br /> civil engineer registered or certified by the State of California. <br /> Monitoring Well Installation Workplan <br /> A. General Information: <br /> Monitoring well locations and rationale <br /> Survey details <br /> Equipment decontamination procedures <br /> Health and safety plan <br /> Topographic map showing any existing monitoring wells, proposed wells, waste handling <br /> facilities, utilities, and other major physical and man-made features. <br /> B. Drilling Details: describe drilling and logging methods <br /> C. Monitoring Well Design: <br /> Casing diameter <br /> Borehole diameter <br /> Depth of surface seal <br /> Well construction materials <br /> Diagram of well construction <br /> Type of well cap <br /> Size of perforations and rationale <br /> Grain size of sand pack and rationale <br /> Thickness and position of bentonite seal and sand pack <br /> Depth of well, length and position of perforated interval <br /> D. Well Development: <br /> Method of development to be used <br /> Method of determining when development is complete <br /> Method of development water disposal <br /> California Environmental Protection Agency <br /> 0 Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br /> nnr WPt_ ;rP r hrr//www cwrrh rn onv/rwnrh5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.