Laserfiche WebLink
6- <br /> September 30, 2007 <br /> NOA Project Number: E07147A <br /> 4.0 DISCUSSION OF NITRATE LOADING RESULTS <br /> /4.1 Total Nitrate Impact <br /> 6- <br /> Based on the method and assumptions described, the result of the nitrate loading balance indicates <br /> that the proposed development would likely to cause a build up of nitrate in the ground water above <br /> 10 mg/L-N over the long term. <br /> Y"4.2 Methods of Mitigation <br /> L <br /> The client has contracted an engineer to design an on-site wastewater treatment system which is <br /> proposed to meet Federal EPA, California State and San Joaquin County On-Site Wastewater Disposal <br /> ` Standards <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS <br /> The client has contracted an engineer to design an on-site wastewater treatment system which is <br /> proposed to meet Federal EPA, California State and San Joaquin County On-Site Wastewater Disposal <br /> Standards Our office has no further recommendations. <br /> 5.1 Signatures <br /> The signatures of the environmental professionals involved in the preparation of this report can be <br /> Lfound on the cover sheet at the front of this package. <br /> /5.2 Attachments <br /> All required attachments and appendices can be found at the rear of this package. <br /> 6.0 LIMITATIONS <br /> LOur professional services were performed, our findings obtained, and our conclusions proposed in <br /> accordance with generally accepted engineering principles and practices. This warranty is in lieu of <br /> all other warranties either expressed or implied. Test findings and statements of professional <br /> Lopinion do not constitute a guarantee or warranty, expressed or implied. <br /> 7 <br /> 6. ".04 <br /> 6- <br />