My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012042
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
5573
>
2600 - Land Use Program
>
PA-1800279
>
SU0012042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:37 AM
Creation date
9/9/2019 11:11:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012042
PE
2626
FACILITY_NAME
PA-1800279
STREET_NUMBER
5573
Direction
W
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
LODI
Zip
95242-
APN
01117052
ENTERED_DATE
10/30/2018 12:00:00 AM
SITE_LOCATION
5573 W WOODBRIDGE RD
RECEIVED_DATE
11/13/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\W\WOODBRIDGE\5573\PA-1800279\SU0012042\APPL.PDF \MIGRATIONS\W\WOODBRIDGE\5573\PA-1800279\SU0012042\EHD COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 117- <br /> STAFF REPORT " Use Permit <br /> Application Information <br /> Owner: Stokes &Lombardi Farms LLC <br /> Applicant: Dillon &Murphy <br /> File Number: PA-1800279 <br /> Location: On the north side of West Woodbridge Road,4,700 feet east of Thornton Road, <br /> Lodi. <br /> Address: 5573 Woodbridge Road, Lodi <br /> General Plan: A/G Community: None <br /> Zoning: AG-40 APN: 011-170-52 <br /> Project Size: 3.00 acres Parcel Size: 45.10 acres <br /> Water Supply: Well Sewage Disposal: Septic <br /> Storm Drainage: On-site 100-Year Flood: No <br /> Williamson Act: Yes Supervisorial District: 4 <br /> Staff: Frank Girardi CEQA Determination: Negative <br /> Declaration <br /> Project Description <br /> This project is a Use Permit application to expand an existing large winery in in five (5) phases over ten <br /> (10) years and to add nineteen (19) marketing events per year with a maximum attendance of 50 people <br /> per marketing event. No outdoor amplified music is proposed at the marketing events. Phase One includes <br /> the construction of a 10,000 square foot Storage and Bottling building. Phase Two, to be completed in <br /> seven (7) years, includes the construction of a 35,000 square foot building for an_Event center, Tasting <br /> room, and Executive offices. Phase Three, to be completed in eight (8) years, includes a 10,000 square <br /> foot expansion to the Phase One Storage and Bottling building. Phase Four, to be completed in 9 (nine) <br /> years, includes a 10,000 square foot expansion to the Phase Three Storage and Bottling building <br /> expansion. Phase five (5)to be completed in ten (10)years, to include a 10,000 square foot expansion to <br /> the Phase Four Storage and Bottling building expansion. (Use Type: Wineries and Wine Cellars-Winery, <br /> Large) <br /> Recommendation <br /> Approval. <br /> San Joaquin County PA-18002791Stokes and Lombardi Farms <br /> Community Development Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.