Laserfiche WebLink
Table 2: Estimated 2007 Sanitary Wastewater Loadings(a) <br /> Estimated Sanitary Total Nitrogen TSS(e) BODs(n <br /> Wastewater Flow(°i Zd)(`( Loading(lbs/day)(tl( Loading(lbs/day) Loading(lbs/day) <br /> Non- <br /> Septic System ID Number Crush Non-Crush Crush Non-Crush Crush Non-Crush Crush Crush %of Total <br /> and Location Season Season Season Season Season Season Season Season Loading(a) <br /> 1 -Visitors Center Employees _180 180 _0.06 0.06 0.32_ _0,32 0.29 0.29 -_ 3%_____ <br /> Visitors 150 150 0.05 0.05 0.26 0.26 0.24 0.24 3% <br /> 2-Grower/Barrel B Employees 195 105 0.07 0.04 0.34 0.18 0.31 0.17 3% _ <br /> Visitors 18 0 0.01 0 0.03 0 0.03 0 0.2% <br /> 3-Production Office/ EMIo ees 1,950 1,320 0.65 0.44 3.42 2.31 3.09 2.09 28% -- <br /> Maintenance <br /> 8% __Maintenance Visitors 32 16 0.01 0.01 0.06 0.03 0.05 0.03 0.4% <br /> 4-Barrel Warehouse A Em to ees 825 675 0.28 0.23 1-- 1.18 1.31 1.07 13% <br /> 5-Rotovac/Ceilar Employees 180 120 0.06 0.04 0.32 0.21 0.29 0.19 3% <br /> 6-Bottling Warehouses Employees 2,400 2,400 0.80 0.80 4.20 4.20 3.80 3.80 41% <br /> 7-Trucker's Restroom Employees 90 60 0.03 0.02 0.16 0.11 0.14 0.10 1% <br /> Visitors 96 36 0.03 0.01 0.17 0.06 0.15 0.06 1% <br /> 8-WarehouseC/Corkland Employees 240 240 0.08 0.08 0.42 0.42 0.38 0.38 4% <br /> 9-Staging Area Employees __- 90 0 0.03 0 0.16 0 _ 0.14 0 1% --- <br /> Visitors 80 0 0.03 0 0.14 0 0.13 0 1% <br /> Working-Day Totals 6,526 5,302 2.2 1.8 11.4 9.3 10.3 8.4 <br /> Season Totals 685 230(hl 927,850(" 2291hl 31010 1,2001h1 1,62511 1,086(h( 1,470((( <br /> (a) Preliminary sanitary wastewater loading calculations at the Woodbridge Winery based on estimated sanitary wastewater flows(Table 1)and typical sanitary <br /> wastewater quality(Table 5).For purposes of estimating loadings,crush and non-crush season sanitary wastewater flows were assumed to be medium-strength. <br /> (b) Estimated sanitary wastewater flow,based on Table 1. <br /> (c) gpd=gallons per working-day <br /> (d) lbs/day=pounds per working-day <br /> (e) TSS=total suspended solids <br /> (f) BODS=5-day biochemical oxygen demand <br /> (g) Septic system location loading contribution as a percentage of the total sanitary wastewater loading. For example,Septic System ID Number 2-Grower Relations <br /> contributes 3.2%of the total sanitary wastewater loading at the Facility. <br /> (h) Assumes 105 working-day crush season. <br /> (i) Assumes 175 working-day non-crush season. <br /> Updated Sanitary Wastewater Estimates Page 1 of 1 <br /> Woodbridge Winery, Acampo, California <br /> c um %a wtms� cAemWeskW4Wdeo2 Wdirgs t"M <br />