Laserfiche WebLink
COUNTY OF SAN JOAQU I NTHO � <br /> . o <br /> M/1S R.FLINN <br /> DEPARTMENT Of PUBLIC WORKS DEP"TMDRECTOR <br /> P.O.BOX 1810-1810 EAST HAZELTON AVENUE �LLLLOPE <br /> STOCKTON.CAUFORNiA 95201-1810 <br /> 209/468-3000 STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> FAX:2091468-2999 <br /> HENRY M.HIRATA <br /> DIRECTOR <br /> September 8, 1998 <br /> i1�cl3Q$��lISLLi ::..77 <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Kai Luoma <br /> FROM: Gabriel Karam, Senior Civil Engineer G k <br /> Public Services Division <br /> SUBJECT: SA-98-54 A SITE APPROVAL APPLICATION FOR A PRIVATE RIGHT-OF-WAY <br /> TO AN ANTIQUATED LOT,LOCATED ON THE SOUTH SIDE OF YETTNER <br /> ROAD,3,800 FEET WEST OF INTERSTATE 5, SOUTH STOCKTON. <br /> (DISTRICT 1). <br /> APPLICANT: Gerald and Dena Brown APN: 193-060-32 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard <br /> Area. <br /> Yettner Road has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is$1,610 for a single family <br /> residence in the Stockton area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions R-90-304,R-91-1025, R-93-167,R-94-179,R-95-650 and R-96-592) <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. The fee currently is $1,760.24 for a <br /> single family residence. The fee shall be automatically increased on January i of each year through <br /> the year 2005 at the rate of 7.66 percent. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> GK:RWH:br <br /> M8105LB10 <br /> E: Manuel Lopez, Deputy Director/Development <br />