My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081029
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NILE
>
5700
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0081029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:29:56 PM
Creation date
9/12/2019 1:42:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0081029
PE
4201
FACILITY_NAME
NILE GARDEN ELEMENTARY SCHOOL
STREET_NUMBER
5700
Direction
E
STREET_NAME
NILE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22607003
ENTERED_DATE
8/13/2019 12:00:00 AM
SITE_LOCATION
5700 E NILE AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Construction Inspection. At a minimum, inspection of the PD trench system <br /> installation should include the items listed below. This is in addition to inspection <br /> work required for a supplemental treatment system, if used. Joint inspection by the <br /> designer, contractor, and CCEH may be required. <br /> • Pre-construction inspection where the construction staking or marking of the <br /> various system components is provided and construction procedures <br /> discussed; <br /> • Water tightness of septic tank and dosing (pump) tank; <br /> • Layout and excavation of dispersal trenches and piping; <br /> • Drain rock material and placement; <br /> • Piping installation and hydraulic ("squirt") test of the distribution system; <br /> • Functioning and setting of all control devices; and <br /> • Final Inspection to verify that all construction elements are in conformance <br /> with the approved plans and specifications, erosion control has been <br /> completed and operation and maintenance guidelines are provided for owner. <br /> F. MANAGEMENT REQUIREMENTS <br /> Recommended minimum procedures and frequency for inspection, maintenance, <br /> monitoring and reporting activities for pressure distribution trench systems are outlined in <br /> Table 1. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.