My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GIBRALTAR
>
4199
>
1900 - Hazardous Materials Program
>
PR0512377
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2025 4:39:55 PM
Creation date
9/13/2019 4:56:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0512377
PE
1921
FACILITY_ID
FA0010089
FACILITY_NAME
STOCKTON LOGISTICS LLC
STREET_NUMBER
4199
Direction
E
STREET_NAME
GIBRALTAR
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17728055
CURRENT_STATUS
01
SITE_LOCATION
4199 E GIBRALTAR CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emergency Evacuation Drill Report <br /> Stockton C&S Grocers ;;' I In ". GDC&PDC Days <br /> nt_ <br /> Fire: ® Ammonia: ❑ Tornado: ❑ Bomb Threat: ❑ <br /> . t :M Mike Garcia s 11 7/1/19 <br /> ' i;r�'M11'sIs mea. Gordan McDonald Ie�t 64 DEGREES <br /> 4 . .. <br /> EvaalllhotSTidfe,,. 12:34 PM MINUTES 3 'naltime 12:44m Event Duration 10 Minutes <br /> Did all associate follow proper <br /> evacuationprocedures? Yes ® No ® Details: <br /> Follow up/Corrective action Yes ❑ No ® Details: <br /> Did the alarm system function <br /> correctly? Yes ❑ No N Details:Some areas did not recieve notification <br /> Follow u /Corrective action Yes ❑ No ® I Details:Facilities has a Cap Ex Projct to repair <br /> Was the facility evacuated within <br /> two 2 minutes? Yes ❑ No N Details:Em to ees were out in 3.30 minutes <br /> Follow u /Corrective action Yes ❑ No ® Details: <br /> Were Muster Leaders present at Details:Leaders were were present good job in head <br /> all muster locations? Yes ® No ❑ count. <br /> Follow u /Corrective action Yes ❑ No ❑ I Details: <br /> Did security follow evacuation <br /> protocol? Yes ® No ❑ Details:All traffic was stopped at gate <br /> Follow u /Corrective action Yes ❑ No ® Details: <br /> Did Fire Marshal have Concerns? Yes ❑ No ® Details:Fire Marshall was not present for this drill <br /> Follow u /Corrective action Yes ❑ No ® Details: <br /> Scenario:ln PDC area an employee did not check for lose debris on scrubber. During employees normal job function debris <br /> ignited causing a small flame. Employee went to pull fire alarm and evacuation was initiated.All employees were accounted <br /> for in muster locations,small fire was extinguished by a member of facilities and there was no food safety risks or damage <br /> to product. Facilities cleared employees to returned to work . <br /> rbeT <br /> eneral Manager; Operations Manager; Facility Director; Regional EHS Manager; Regional Security <br /> ana er; Regional HR Manager; <br /> Event Coordinator: Leo Gonzalez <br /> Coordinator's Title: EHS Supervisor <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.