My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BELLA LAGO
>
1699
>
2900 - Site Mitigation Program
>
PR0523856
>
WORK PLANS CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 3:16:55 PM
Creation date
9/16/2019 3:06:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0523856
PE
2965
FACILITY_ID
FA0016065
FACILITY_NAME
OAKWOOD SHORES
STREET_NUMBER
1699
STREET_NAME
BELLA LAGO
STREET_TYPE
WAY
City
MANTECA
Zip
95337
APN
24152013
CURRENT_STATUS
01
SITE_LOCATION
1699 BELLA LAGO WAY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> EXPECT MORE"" <br /> laboratory results. The drums are labeled with the date, well number, and a contact <br /> person and phone number. <br /> D-3.3 Equipment Decontamination <br /> To reduce the potential for cross-contamination between wells, developing equipment is <br /> washed in a trisodium phosphate or non-phosphate detergent solution and rinsed in <br /> distilled water or steam cleaned prior to use in the next monitoring well. <br /> D-3.4 Well Survey <br /> The locations of soil borings and monitoring wells, and the elevation of the top of the <br /> PVC casings are usually surveyed and tied into permanent markers, if readily available. <br /> Survey accuracy is 0.1 foot for the "x" and "y" coordinates and .01 foot for the "z" <br /> coordinate. The depth to static groundwater is measured from a set location at the top <br /> of the PVC casing (usually the north rim). The depth of water is then subtracted from <br /> the elevation of the top of the well casing to provide a groundwater elevation for each <br /> monitoring well location. <br /> D-4 GROUNDWATER MONITORING <br /> D-4.1 Water Level Measurements <br /> Water level measurements are made in the wells prior to purging and sampling the <br /> wells. Measurement protocol is as follows: <br /> 1. Prior to obtaining water level measurements, the monitoring wells would be <br /> opened and allowed to equilibrate for a period of approximately 1/2 hour. <br /> 2. The water level probe is decontaminated in a trisodium phosphate or non- <br /> phosphate detergent wash, followed by a distilled water rinse, prior to use in <br /> each well. <br /> 3. Water level measurements are made using a conductivity-based water-level <br /> meter. Depth-to-water is generally measured from a surveyed mark on the north <br /> rim of the PVC well casing. <br /> The water level measurements are converted to elevations using the surveyed casing <br /> elevations. <br /> D-4.2 Groundwater Sampling <br /> Groundwater samples are collected from the monitoring wells at the site. The sampling <br /> protocol for each well is as follows: <br /> 1. Down-well equipment (pumps, bailers, etc.) is decontaminated by steam <br /> cleaning, or by scrubbing in a trisodium-phosphate or non-phosphate detergent <br /> 48093.E01/ST07R052/CJC/Iv Page D-5 <br /> ©2007 Kleinfelder, Inc January 26, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.