My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BELLA LAGO
>
1699
>
2900 - Site Mitigation Program
>
PR0523856
>
WORK PLANS CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 3:16:55 PM
Creation date
9/16/2019 3:06:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0523856
PE
2965
FACILITY_ID
FA0016065
FACILITY_NAME
OAKWOOD SHORES
STREET_NUMBER
1699
STREET_NAME
BELLA LAGO
STREET_TYPE
WAY
City
MANTECA
Zip
95337
APN
24152013
CURRENT_STATUS
01
SITE_LOCATION
1699 BELLA LAGO WAY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> KLEINFELDER <br /> EXPECT MORE <br /> A Kleinfelder, environmental geologist will be on site during the tank removal activities <br /> to collect soil samples for qualitative field screening and laboratory analysis. Tank <br /> excavation soil samples will be obtained by scraping the sidewalls or excavation bottom <br /> at the desired locations with the backhoe bucket. Samples will then be collected from <br /> the bucket by packing soil in a clean brass tube with a clean hand trowel. The soil <br /> samples may also be collected using a slide hammer lined with a clean brass tube with <br /> appropriate extension to reach the desired sampling depth. The collected brass tubes <br /> will then be sealed with Teflon sheets and tight fitting plastic caps. <br /> D-8.2 Collection of Water Samples and Laboratory Analysis <br /> If water is encountered in the excavation after the tank is removed, a representative <br /> sample will be collected for laboratory analysis. The tank excavation may be purged <br /> and allowed to refill before sampling. The water sample will be collected using a clean <br /> disposable bailer with new nylon cord. The bailer will be retrieved and the water will be <br /> contained in appropriate bottles supplied by the analytical laboratory for the requested <br /> analysis. <br /> In accordance with the Tri-Regional Guidelines one water sample will be collected from <br /> the tank excavation. The water sample will be delivered under chain-of-custody <br /> procedures to a state certified laboratory. <br /> 48093.E01/ST07R052/CJC/Iv Page D-8 <br /> ©2007 Kleinfelder, Inc January 26, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.