My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:02 PM
Creation date
9/16/2019 4:40:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\bmascaro
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 4/11 /19 <br /> /f you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in4ank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annu/arspaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment, 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> vent iinesicaruon canister <br /> A L-5 <br /> A F <br /> L-6 ` 7 <br /> F V N <br /> I LD-2 <br /> L1 <br /> 9TP <br /> W E <br /> 0 S 9 <br /> FX-1 D V 9 <br /> L-4 <br /> Diesel <br /> STP <br /> F r <br /> Unleaded O <br /> V LD- 0 <br /> n <br /> L-311 <br /> V ILD-20 <br /> T P L-2 I t <br /> a <br /> i Vapor return line Floats n chains Floats n chains <br /> Unleaded product e <br /> 7B 1 /2 <br /> r <br /> d <br /> i <br /> ESO <br /> 5/6 3/4 <br /> Floats n chains Floats n chains <br /> TLS-350 LEGEND <br /> Liquid sensor <br /> L-1 91 -1 STP <br /> L-2 91 -2 STP <br /> L-3 87 STP <br /> L-4 Diesel STP <br /> L-5 91 -1 /91 -2/diesel annular <br /> L-6 87 annular <br /> ESO Emergency shut off <br /> UNA07 www, unidocs. org 6/6 - Rev. 10/01 /18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.