Laserfiche WebLink
2IZZ 2P' '3 M Treatment System Inspection Schedule <br /> Frequency Inspection Category Detail OK(V) Notes <br /> Health and Safety Safety Shower <br /> Annual Eyewash <br /> Equipment First Aid Kit <br /> Erosion/Settlement/ Erosion <br /> Annual Settlement <br /> Cover Integrity General cover integrity <br /> Monthly Precipitation <br /> Rainfall total(indicate inches in <br /> notes) S <br /> Swales,ditches and conduits <br /> free of excessive debris <br /> Storm water retention basin <br /> Annual Stormwater Control free of excessive erosion <br /> Measures Storm water retention basin <br /> free of vegetation <br /> Storm water retention basin <br /> freeboard>2 feet <br /> See Wellhead Condition Form <br /> Semi-Annual Well Head w/monitoring&sampling <br /> records <br /> Treatment compound locks and <br /> Monthly,HM Security Control fencing intact <br /> Devices Sample ports secure without <br /> tool <br /> Semi-Annual, Treatment System Vessels intact with no leaks <br /> HM Vessels Associated gauges in working <br /> order <br /> Keamey-KPF Facility DUDEK <br /> Stockton,CA November 2016 <br />