Laserfiche WebLink
5�2 -5-r^ Treatment System Inspection Schedule <br /> Conditions <br /> Inspection Description Frenquency necessitating <br /> inspection <br /> Well Head Conditions The following well conditions will be inspected during groundwater monitoring Sen}i-atZnually <br /> events:well seal,survey markings,lock and cover,concrete pad and label. <br /> Health and Safety Equipment Safety shower and eyewash will be checked for function,first aid kit supply will be Annually <br /> checked <br /> Consistent Inspections <br /> Integrity Covers of"ponds"1&2 will be inspected for erosion damage or other damage Ann II (Regardless of treatment <br /> Erosion/Settlement/Cover <br /> g y that may violate their integrity y operation or presence of <br /> hazardous chemicals) <br /> Storm water control measures will be inspected annually. Swales,ditches and <br /> Storm Water Control Measures other conduits will be inspected. Brush or other foreign materials will be A� y <br /> controlled to maintain adequate storm water flow. The infilitration basin will be <br /> inspected for erosion or settlement that may affect its performance. <br /> Security Control Devices Security control devices such as locks and fencing will be check for function and Monthly <br /> integrity. <br /> Hazardous Material <br /> Collection Pipelines and Aboveground collection piping,valves and gauges will be inspected for leaks and Inspections <br /> Appurtenances proper function. Secondary containment piping will be visually examined for leaks. Semi-arinually (Inspected only if hazardous <br /> materials are stored onsite, <br /> regardless of operation status) <br /> 'Treatment System Vessels <br /> All treatment system vessels will be inspected for leaks. Gauges associated with <br /> the treatment vessels will also be inpsected for proper function Semi-annually <br /> Treatment system pressure gauges,flow meters,other equipment on the <br /> Treatment System Equipment Monthly . <br /> Operation Log <br /> Sample Collection Ports Sample collection ports will be inspected for proper function, Semi-annually <br /> Effluent Pipelines and Aboveground effluent piping,valves and gauges will be inspected for leaks and Semi-annually <br /> Appurtenances proper function. <br /> Treatment System <br /> Basin Water level in the basin will be recorded.The basin will be inspected for erosion Monthly Operations Inspection <br /> and subsidence and to ensure that there is adequate freeboard. (Inspected only if Treatment <br /> System is operating) <br /> 'Treatment System Piping Treatment system piping and valve will be checked for leaks and proper function. Se m=annually <br /> 'Treatment System Controls and � <br /> Treatment system controls and alarms will be checked for proper function. Semi-annually <br /> Alarms <br /> \ <br /> VOCs,1,4-dioxane,TDS,field parameters,total vol.extracted,extraction rate,avg. <br /> Extraction Wells <br /> extraction rate pressure,water level Semi-annually <br /> Kearney-KPF Facility DUDEK <br /> Stockton,CA November 2016 <br />