Laserfiche WebLink
OpIraf/16 <br /> A"-U . <br /> Treatment System Inspection Schedule .A. 4L, ��IA <br /> Conditions <br /> Inspection Description Frenquency necessitating <br /> inspection <br /> Well Head Conditions The following well conditions will be inspected during groundwater monitoring Semi-annually <br /> events:well seal,survey markings,lock and cover,concrete pad and label. <br /> Health and Safety Equipment Safety shower and eyewash will be checked for function,first aid kit supply will be Annually <br /> checked Consistent Inspections <br /> Covers of"ponds"1&2 will be inspected for erosion damage or other damage (Regardless of treatment <br /> Erosion/Settlement/Cover Integrity that may violate their integrity Annually operation or presence of <br /> hazardous chemicals) <br /> Storm water control measures will be inspected annually. Swales,ditches and <br /> other conduits will be inspected. Brush or other foreign materials will be <br /> Storm Water Control Measures Annually <br /> controlled to maintain adequate storm water flow. The infilitration basin will be <br /> inspected for erosion or settlement that may affect its performance. <br /> Security Control Devices Security control devices such as locks and fencing will be check for function and Monthly *� <br /> integrity. <br /> Hazardous Material <br /> Collection Pipelines and Aboveground collection piping,valves and gauges will be inspected for leaks and Inspections <br /> y <br /> Semi-annuallIns <br /> Appurtenances proper function. Secondary containment piping will be visually examined for leaks. (inspected only if hazardous <br /> materials are stored onsite, <br /> regardless of operation status) <br /> Treatment System Vessels All treatment system vessels will be inspected for leaks. Gauges associated with Semi-annually <br /> the treatment vessels will also be inpsected for proper function <br /> Treatment System Equipment Treatment system pressure gauges,flow meters,other equipment on theMonthly <br /> Operation Log <br /> Sample Collection Ports Sample collection ports will be inspected for proper function. Serol-annually <br /> Effluent Pipelines and Aboveground effluent piping,valves and gauges will be inspected for leaks and Semi-annually <br /> Appurtenances proper function. <br /> Treatment System <br /> Water level in the basin will be recorded.The basin will be inspected for erosion Operations Inspection <br /> Basin and subsidence and to ensure that there is adequate freeboard. Monthly <br /> q (Inspected only if Treatment <br /> System is operating) <br /> Treatment System Piping Treatment system piping and valve will be checked for leaks and proper function. Semi-annually <br /> Treatment System Controls and Treatment system controls and alarms will be checked for proper function. Semi-annually <br /> Alarms <br /> VOCs,1,4-dioxane,TDS,field parameters,total vol.extracted,extraction rate,avg. <br /> Extraction Wells Semi-annually <br /> extraction rate,pressure,water level <br /> Kearney-KPF Facility D U DEK <br /> Stockton,CA November 2016 <br />