Laserfiche WebLink
SECTION 4 <br /> SPILL CONTAINMENT <br /> A. Spill Mitigation Coordinator R . A. Ellis I I I <br /> B. Safety Equipment On-Hand <br /> Equipment Location <br /> Eye Wash & Safety Showers 3 locations in Wash Area , near <br /> neutralizer , adjacent to Chem . <br /> storage tank & on wash rack . <br /> r <br /> C. Spill Control Equipment On-Hand <br /> Equipment Location <br /> Concrete containment dikes Around neutralizer area and <br /> around chem. storage tanks . <br /> D. Monitoring Equipment On-Hand <br /> Equipment Location <br /> 3 ph monitors & 2 ph control 2 Neutralizer tanks & final <br /> systems . monitoring & settling tank in <br /> fully automatic control system. <br /> E. Specialized Spill Containment and Clean-Up Companies or Agencies On Call <br /> 24-Hour <br /> Name Location Telephone No. <br /> 1. Self* <br /> 2. <br /> # Cal Tank Lines , Inc . is an approved hazardous waste hauler . <br />