My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2.0:PROJECT DESCRIPTION <br /> 2.1.2.1 Shared Existing Facilities <br /> The following existing elements of the STIG plant's infrastructure will be shared between <br /> the two facilities: <br /> • The anhydrous ammonia system,including both the 12,000-gallon storage tank and <br /> unloading facilities <br /> • The 230-kilovolt (W) switchyard and interconnect <br /> • The fire systems,including fire water storage tanks and diesel-fired emergency fire <br /> pump <br /> • The domestic water systems,including eye wash stations and emergency showers <br /> • The existing Class I underground injection well (to be used for backup only) <br /> 2.1.2.2 New or Modified Facilities <br /> The following facilities will be modified or built as part of the LEC project. <br /> • The administration building,including the control room,office space,maintenance shop <br /> and communication systems. These facilities will be shared by both the LEC and STIG <br /> facilities. <br /> • The warehouse facilities. These facilities will be shared by both the LEC and STIG <br /> facilities. <br /> • The existing commercial cooling tower for the STIG plant will be relocated to <br /> accommodate the LEC plant,but will not be shared by both facilities <br /> • The existing gas metering station for the STIG plant will be relocated to accommodate <br /> the LEC plant but will not be shared by both facilities <br /> The remaining facilities and activities at the STIG plant will not be shared between the <br /> two sites, are not part of the LEC project, and,therefore,have not been considered in this <br /> Application for Certification (AFC). <br /> 2.1.3 Activities Not Part of the Project <br /> 2.1.3.1 NCPA Combustion Turbine Project Number 1 Staff Relocation Project <br /> NCPA currently operates its Combustion Turbine Project Number 1 (CTG1),which consists <br /> of five combustion turbines located on three sites. Two combustion turbines are in Roseville, <br /> one combustion turbine is in Lodi, and two combustion turbines are in Alameda. The City of <br /> Roseville will be taking over the operation and maintenance of the two combustion turbines <br /> in Roseville, and as a result,NCPA will be relocating seven of its employees from the <br /> Roseville site to the Lodi STIG plant site. This relocation requires remodeling of the existing <br /> STIG administration building to accommodate these employees. This remodeling effort will <br /> involve converting the warehouse portion of the existing administration building to usable <br /> office space. This,in turn,requires construction of a new warehouse to replace the <br /> converted warehouse space and to house the parts and equipment currently stored at the <br /> Roseville site. To facilitate the relocation project, a temporary trailer for office space and <br /> document storage will be placed on the STIG site until the remodeling of the administration <br /> 2-2 SAC/371322/082340003(LEC_2.0_PROJECT_DESC.DOC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.