Laserfiche WebLink
5.1 AIR QUALITY <br /> TABLE 5.1-45 <br /> Laws,Ordinances, Regulations,Standards,and Permits for Protection of Air Quality <br /> Conformance <br /> Regulating Schedule and Status of (Section; <br /> LORS Purpose Agency Permit or Approval Permit Page) <br /> Federal <br /> Clean Air Act(CAA)§160-169A and Requires prevention of significant EPA Issues PSD permit with Agency approval to be §5.1.7.1.1; <br /> implementing regulations,Title 42 deterioration(PSD)review and facility conditions limiting emissions. obtained before start of p.5.1-59 <br /> United States Code(USC) permitting for construction of new or construction. et seq <br /> §7470-7491 (42 USC 7470-7491), modified major stationary sources of air <br /> Title 40 Code of Federal Regulations pollution. PSD review applies to pollutants Appendix 5.1C <br /> (CFR)Parts 51 &52(40 CFR 51 & for which ambient concentrations are <br /> 52)(Prevention of Significant lower than NAAQS. <br /> Deterioration Program ) <br /> CAA§171-193,42 USC§7501 et Requires new source review(NSR)facility SJVAPCD After project review, issues Agency approval to be §5.1.7.3; <br /> seq. (New Source Review) permitting for construction or modification with EPA FDOC/ATC with conditions obtained before start of p. 5.1-70 et <br /> of specified stationary sources. NSR oversight limiting emissions. construction. seq <br /> applies to pollutants for which ambient <br /> concentration levels are higher than Appendix 5.1 C <br /> NAAQS. <br /> CAA§401 (Title IV),42 USC§7651 Requires reductions in NOX and SO2 SJVAPCD Issues Acid Rain(FDOC/ATC) Application to be made §5.1.7.1.4; <br /> (Acid Rain Program) emissions. with EPA permit after review of within 12 months of start of p.5.1-67 <br /> oversight application. facility operation; LEC not <br /> subject to this program. <br /> CAA§501 (Title V),42 USC§7661 Establishes comprehensive permit SJVAPCD Issues amended Title V permit Application for amendment §5.1.7.1.4; <br /> (Federal Operating Permits Program) program for major stationary sources. with EPA after review of application. to be made at least 12 p.5.1-67 <br /> oversight months prior to start of <br /> facility operation. <br /> CAA§111,42 USC§7411,40 CFR Establishes national standards of SJVAPCD After project review, issues Agency approval to be §5.1.7.1.2; <br /> Part 60(New Source Performance performance for new stationary sources. with EPA FDOC/ATC with conditions obtained before start of p.5.1-66 <br /> Standards[NSPS]) oversight limiting emissions. construction. <br /> CAA§112,42 USC§7412,40 CFR Establishes national emission standards SJVAPCD After project review, issues Agency approval to be §5.1.7.1.3; <br /> Part 63(National Emission for hazardous air pollutants. with EPA FDOC/ATC with conditions obtained before start of p.5.1-66 <br /> Standards for Hazardous Air oversight limiting emissions. construction. <br /> Pollutants[NESHAPs]) <br /> SAC/371322/082410013(LEC_5.1_AIR_QUALITY.DOC) 5.1-71 <br />