Laserfiche WebLink
5.4 GEOLOGIC HAZARDS AND RESOURCES <br /> TABLE 5.4-1 <br /> Laws,Ordinances, Regulations,and Standards for Geologic Hazards and Resources <br /> Requirements/ AFC Section Explaining <br /> LORS Applicability Administering Agency Conformance <br /> State/Local <br /> CBC, 2007 as Acceptable design California Building Section 5.4.2.2 <br /> amended by San criteria for structures Standards Commission, <br /> Joaquin County and with respect to seismic State of California, County of <br /> the City of Lodi design and load- San Joaquin, and the City of <br /> bearing capacity Lodi <br /> Alquist-Priolo Identifies areas subject California Building Section 5.4.2.2 <br /> Earthquake to surface rupture from Standards Commission, <br /> Fault Zoning Act(Title active faults State of California, County of <br /> 14, Division 2, San Joaquin, and the City of <br /> Chapter 8, Lodi <br /> Subchapter 1,Article <br /> 3, California Code of <br /> Regulations) <br /> The Seismic Hazards Identifies non-surface California Building Section 5.4.2.2 <br /> Mapping Act(Title 14, fault rupture earthquake Standards Commission, <br /> Division 2, Chapter 8, hazards, including State of California, County of <br /> Subchapter 1,Article liquefaction and San Joaquin, and the City of <br /> 10, California Code of seismically induced Lodi <br /> Regulations.) landslides <br /> County of San Compliance of the County of San Joaquin Section 5.4.2.2 <br /> Joaquin (1992) Safety Element of the <br /> General Plan, County <br /> of San Joaquin <br /> General Plan <br /> City of Lodi (1991) Compliance of the City of Lodi Section 5.4.2.2 <br /> Safety Element of the <br /> General Plan, City of <br /> Lodi General Plan <br /> 5.4.6 Agencies and Agency Contacts <br /> Compliance of building construction with CBC standards is covered under engineering and <br /> construction permits for the project. There are no other permit requirements that specifically <br /> address geologic resources and hazards. However, excavation/grading and inspection <br /> permits may be required prior to construction and will be included in the overall project <br /> construction permit (see Section 5.6, Land Use). <br /> 5.4.7 Permits and Permit Schedule <br /> Compliance of building construction to CBC standards is covered under engineering and <br /> construction permits for the project that are within the exclusive jurisdiction of the CEC. <br /> There are no other permit requirements that specifically address geologic resources and <br /> hazards for compliance with geologic LORS. <br /> SAC/371322/082330011(LEC-5.4-GEOLOGIC HAZARDS AND RESOURCES.DOC) 5.4-11 <br />