Laserfiche WebLink
WASTE DISCHARGE REQIWMENTS ORDER NO. 2000-**** • -17- <br /> CITY OF LODI <br /> WHITE SLOUGH WATER POLLUTION CONTROL PLANT <br /> SAN JOAQUIN COUNTY <br /> 15. Taste or odor-producing substances to impart undesirable tastes or odors to fish-flesh or <br /> other edible products of aquatic origin or to cause nuisance or adversely affect beneficial <br /> uses. <br /> 16. The fecal coliform concentration in any 30-day period to exceed a geometric mean of <br /> 200 MPN/100 ml, or cause more than 10 percent of total samples to exceed <br /> 400 NUN/100 ml. <br /> G. Groundwater Limitations: <br /> 1. The discharge of reclaimed water and biosolids or the ponding of wastewater shall not <br /> cause underlying groundwater to contain waste constituents in concentrations greater <br /> than background water quality at or beyond the point of compliance. The point of <br /> compliance shall be as close to the point of discharge as possible, and shall not extend <br /> beyond the edge of the property owned by the discharger. <br /> 2. Any incremental increase in waste constituent concentrations within the point of <br /> compliance, when compared to background, shall not exceed the increase typically <br /> caused by the percolation of domestic wastewater. <br /> 3. The discharge shall not cause the groundwater to exceed water quality objectives, <br /> unreasonably affect beneficial uses, or cause a condition of pollution or nuisance. <br /> 4. Any increase in total coliform organisms shall not exceed a most probable number of <br /> 2.2/100 ml over any seven-day period. <br /> H. Provisions: <br /> 1. The Discharger shall maximize land disposal of effluent. The Discharger shall submit a <br /> plan to maximize land disposal of effluent within 180 days of adoption of this Order <br /> for approval by the Executive Officer. <br /> 2. The Discharger shall comply with the following time schedule to assure compliance with <br /> the treatment requirements to protect the beneficial uses of body water contact recreation <br /> and irrigation of food crops, as required by Effluent Limitation B.2. of this Order: <br /> Compliance Report <br /> Task Date Due <br /> Begin Design 1 March 2001 1 April 2001 <br /> Complete CEQA Process 1 December 2001 1 January 2002 <br /> Final Plans and Specifications 1 February 2002 1 March 2002 <br /> Begin Construction 1 May 2002 1 June 2002 <br /> Full Compliance 1 May 2004 1 June 2004 <br />