My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1980-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
SITE INFORMATION AND CORRESPONDENCE 1980-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:48:37 AM
Creation date
9/26/2019 8:26:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1980-1999
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. 5-00- -19- <br /> CITY OF LODI <br /> WHITE SLOUGH WATER POLLUTION CONTROL PLANT <br /> SAN JOAQUIN COUNTY <br /> H. Provisions: <br /> 1. The Discharger shall maximize land disposal of effluent. The Discharger shall submit a <br /> plan to maximize land disposal of effluent within 180 days of adoption of this Order <br /> for approval by the Executive Officer. This report shall comply with the requirements of <br /> Section 60323, Title 22, of the California Code of Regulations. <br /> 2. The Discharger shall comply with the following time schedule to assure compliance with <br /> the treatment requirements to protect the beneficial uses of body water contact recreation <br /> and irrigation of food crops, as required by Effluent Limitation B.2. of this Order: <br /> Compliance Report <br /> Task Date Due <br /> Begin Design 1 March 2001 1 April 2001 <br /> Complete CEQA Process 1 December 2001 1 January 2002 <br /> Final Plans and Specifications 1 February 2002 1 March 2002 <br /> Begin Construction 1 May 2002 1 June 2002 <br /> Full Compliance 1 May 2004 1 June 2004 <br /> The Discharger shall submit to the Board on or before each compliance report due date, the <br /> specified document or, if appropriate, a written report detailing compliance or noncompliance <br /> with the specific schedule date and task. Board staff shall review and approve all plans and <br /> specifications of the proposed disinfection facility prior to construction activities. If <br /> noncompliance is being reported, the reasons for such noncompliance shall be stated, plus an <br /> estimate of the date when the Discharger will be in compliance. The Discharger shall notify <br /> the Board by letter when it returns to compliance with the time schedule. <br /> 3. The Discharger shall post Dredger Cut as a wastewater disposal area until such time as <br /> the discharge is in compliance with Effluent Limitation B.3. <br /> 4. The Discharger shall submit a report that evaluates its ability to comply with Biosolids <br /> Specifications within 90 days of adoption of this Order for approval by the Executive <br /> Officer. <br /> 5. The Discharger shall submit a report that evaluates its ability to comply with Effluent <br /> Limitation B. 5., and Receiving Water Limitations F. 9. and F. 10. for temperature <br /> within 180 days of adoption of this Order, for approval by the Executive Officer. <br /> 6. The Discharger shall conduct monitoring for mercury as specified in the Monitoring and <br /> Reporting Program. If after review of the monitoring results it has been determined that <br /> the discharge has a reasonable potential to cause or contribute to an exceedance of a <br />
The URL can be used to link to this page
Your browser does not support the video tag.