Laserfiche WebLink
-2- <br /> FACT SHEET ORDER NO. 5-00-031 <br /> ATTACHMENT C <br /> CITY OF LODI <br /> WHITE SLOUGH WATER POLLUTION CONTROL PLANT <br /> SAN JOAQUIN COUNTY <br /> outlined below (Stations R-1 through R-4 are as outlined in the Monitoring and Reporting <br /> Program.): <br /> Receiving Water Dissolved Oxygen <br /> Monitoring Results (Monthly Average), and <br /> Number of Samples less than 5 mg/1 <br /> Date Flow BOD R-1 R-2 R-3 R-4 <br /> (mRd) (lb/day) (mail) (mg/1) (ma/0 (mail) <br /> Jan 97 5.8 532 4.2' (9 of 9)' 7.1 (1 of 9) 8.4 (0 of 9) 4.7 (5 of 9) <br /> Feb 97 5.6 467 5.6 (2 of 8) 8.0 (1 of 8) 9.1 (0 of 8) 6.2 (2 of 8) <br /> Mar 97 5.5 440 5.7 .(0 of 4) 11.5 (0 of 4) 11.0 (0 of 4) 10.5 (0 of 4) <br /> Apr 97 5.5 367 5.7 (1 of 6) 10.6 (0 of 6) 11.1 (0 of 6) 9.4 (0 of 6) <br /> May 97 5.6 411 6.2 (0 of 1) 12.2 (0 of 1) 10.8 (0 of 1) 1.5 (0 of 1) <br /> Jun 97 0 --- --- --- --- --- --- --- --- --- <br /> Jul 970 --- --- --- --- --- --- --- --- --- <br /> Aug 97 5.7 295 5.1 (2 of 5) 8.4 (0 of 5) 8.8 (0 of 5) 7.2 (0 of 5) <br /> Sep 97 5.5 239 5.2 (3 of 6) 8.7 (0 of 6) 8.7 (0 of 6) 7.7 (0 of 6) <br /> Oct 97 5.3 177 5.9 (0 of 6) 10.4 (0 of 6) 10.5 (0 of 6) 9.6 (0 of 6) <br /> Nov 97 5.5 275 5.2 (1 of 8) 8.6 (0 of 8) 9.3 (0 of 8) 7.0 (0 of 8) <br /> Dec 97 5.9 379 5.8 (1 of 10) 10.1 (0 of 10) 10.8 (0 of 10) 9.3 (0 of 10) <br /> Jail 98 5.9 492 5.6 (2 of 8) 8.2 (0 of 8) 9.4 (0 of 8) 7.3 (0 of 8) <br /> Feb 98 6.3 473 4.4 (7 of 8) 7.4 (0 of 8) 9.0 (0 of 8) 4.9 (5 of 8) <br /> Mar 98 5.8 532 5.1 (3 of 9) 9.1 (0 of 9) 10.0 (0 of 9) 6.7 (1 of 9) <br /> Apr 98 5.6 514 5.1 (4 of 9) 11.8 (0 of 9) 11.0 (0 of 9) 9.9 (0 of 9) <br /> May 98 5.6 448 5.2 (4 of 8) 10.5 (0 of 8) 8.9 (0 of 8) 9.7 (0 of 8) <br /> 1 Monthly average dissolved oxygen concentration <br /> 2 Number of individual samples with dissolved oxygen concentrations less than 5 mg/l compared to the total <br /> number of samples collected. <br /> The data shows that at the current discharge rate of less than 6 mgd, corresponding to a BOD <br /> loading of up to 5321b/day, the dissolved oxygen in Dredger Cut (R-1) does not meet the Basin <br /> Plan objective for dissolved oxygen of 5 mg/1 in 39% of samples collected when discharge was <br /> occurring, whereas it is usually met further downstream below the confluence with Bishop Cut and <br /> White Slough (R-2 and R-3). The discharge is causing or contributing to the violations. Studies <br /> completed to date indicate that the discharge of 8.5 mad of secondary-treated effluent may cause <br /> violations of the dissolved oxygen objective to also occur in White Slough and Bishop Cut. This <br /> Order includes more stringent effluent limits for BOD than were imposed in the past. This alone <br /> will not prevent excursions of the dissolved oxygen objective in Dredger Cut. Therefore, this Order <br /> also requires the Discharger to maximize land disposal of effluent, and prohibits discharges when <br /> dissolved oxygen concentrations in Dredger Cut are less than 5 mg/1. The Discharger is not <br /> currently capable of meeting these requirements. Full compliance with the BOD effluent limit is <br /> not required by this Order until 1 May 2004. <br />