Laserfiche WebLink
EXHIBIT A <br /> WHITE SLOUGH WATER POLLUTION CONTROL FACILITY <br /> DAILY INSPECTION SHEET <br /> DATE <br /> BLOWER ROOM <br /> AIR COMP PSI DRAIN RECEIVERS ELECTRICAL FEED SOURCE # <br /> #1 INLET BRN. DISCHG. TEMP OUTLET BRN. PRESSURE <br /> #2 INLET BRN. DISCHG. TEMP OUTLET BRN. PRESSURE <br /> #3 INLET BRN. DISCHG. TEMP OUTLET BRN. PRESSURE <br /> #4 INLET BRN. DISCHG. TEMP OUTLET BRN. PRESSURE <br /> CL2 BUILDING <br /> BUFFERS WATER AND DRAIN LINES RINGS RAS <br /> POST CL2 #1 #2 CL2 BULK TANK S02 BULK TANK EFF. TEMP <br /> FLOW CL2 RESIDUALS DOSE FINAL <br /> S02 RESIDUAL S02 <br /> CL2 BASEMENT <br /> PUMPS OPERATIONS PURGE SPRAY LINES SUMP PUMPS <br /> CLEAN INJECTOR SCREEN PLANT IRRIGATION <br /> NORTH ELECTRICAL ROOM <br /> STATUS OF MCC ALARM STATUS STRAINER TIMER <br /> SJCMVCD FLOW METER <br /> CL2 CONTACT TANKS <br /> CL2 MIXER CL2 SAMPLE PUMP APPEARANCE TELESCOPIC VALVE <br /> SECONDARY SED STRUCTURE <br /> FLIGHT DRIVES WEIRS SLUDGE BLANKETS #1 , #2 SKIMMERS <br /> CHECK ALL PUMPS PURGE BUBBLER PANELS SUMP PUMPS <br /> DRAIN AIR RECEIVE MCC'S AND VFD STATUS LCP-S STATUS <br /> SWITCH CL2 AT RINGS <br /> LCP-E 1 <br /> TAILWATER AND RECIRC. PUMPS PURGE EFFLUENT FLOW METER <br /> AERATION BASINS <br /> APPEARANCE #1 , #2 , #3 , #4 <br /> PRIMARY SED BASINS <br /> FLIGHT DRIVES, WEIRS AND SPRAYS CYCLONE GRIT SEPARATOR <br /> SLUDGE LEVELS #1 , #2 #3 , #4 , #5 <br /> GREASE PITS #1 , #2 , #3 <br /> UPPER LEVEL INFLUENT PUMP ROOM <br /> LCP-H STATUS SLUDGE PUMP TIMERS <br /> DOMESTIC CONTROLLER INDUSTRIAL CONTROLLER <br /> LOWER LEVEL INFLUENT PUMP ROOM <br /> INDUSTRIAL PUMP #1 #2 DOMESTIC PUMP#1 #2 #3 <br /> PURGE BUBBLERS AIR RECEIVER SUMP PUMPS <br /> PRIMARY SLUDGE PUMP ROOM <br /> PRIMARY SLUDGE/SCUM PUMPS #1 #2 #3 , #4 , #5 #6 #7 <br /> #8 , #9 , #10 PUMP PACKING DRAIN AND PURGE BUBBLERS <br /> VVTRQLTYCNTRL9903A Page 1 Of 2 <br />