The 1992 improvements,which expanded White Slough to 8.5 <br /> I l w million gallons per Clay,is the largest public works project in the <br /> i . <br /> yl City's history. In recognition of the plant's standing in the <br /> environmental community,it was presented the"Plant of the <br /> qtr <br /> y sm. <br /> � g � Year"award by the Northern San Joaquin Section of the California <br /> Water Pollution Control Association. <br /> r The plant design features parallel treatment systems for domestic <br /> 1 2 3 <br /> and industrial wastewater. The domestic portion of the flow is <br /> _ treated in an activated sludge system.stem. The industrial wastewater <br /> is treated in aerated ponds. Effluent from both systems is <br /> reclaimed by irrigation on adjacent City-owned agricultural land. <br /> Y <br /> Storage ponds for winter industrial flows are included for use <br /> when conditions are too wet for land disposal. Domestic effluent <br /> ►� is discharged to the Delta <br /> at when irrigation needs have <br /> been met and during non-irrigation seasons. <br /> 5 6 <br /> r' ............. � <br /> 9 <br /> _v. MEAi <br /> 4 7 8 s <br /> 1. New motor control centers were provided and new pumps,compressors,valves, <br /> in the South Electrical Room. An existing and piping. <br /> vacant building was converted to house <br /> this equipment. 5. New chlorination and dechlorination <br /> equipment was installed in the existing <br /> 2. New centrifugal blowers were installed chlorination building,and new bulk c <br /> to provide air to the aeration basins. A chemical storage facilities were added. <br /> computer controlled inlet butterfly valve F <br /> throttles intake air to match blowers 6. New chemical feed piping was provided . <br /> with process demands, to serve new facilities. <br /> 3. Primary sludge and scum pumps were 7. Return activated sludge pumps,installed FACILITY OVERVIEW <br /> installed in the new Primary Sludge Pump in the new secondary sludge pump station, <br /> Room adjacent to the new primary sedi- are flow paced by the plant influent flow. 0 HEAUWORKS c SECONDARY SLUDGE PUMPING STA. BULK CHLORINEISULEUR DIOXIDE STORAGE <br /> mentation basins. GRIT WASHING 0 CONTROL BLDG. STORAGE BLDG. <br /> 8. Control Building improvements included PRIMARY SEDIMENTATION BASINS t DIGESTER CONTROL BLDG. SLUDGE LAGOON <br /> AERATION BASINS ANAEROBIC DIGESTERS AERATED LAGOON <br /> 4. Improvements to the digester complex a new entryway,new conference/training CHLORINE CONTACT TANKS G DISSOLVED AIR ELOTATIONTHICKENERS EQUALIZATION POND <br /> included a new 45 ft diameter digester; room,remodeled locker rooms and CHLORINATION BLDG. SOUTH ELECTRICAL ROOM a IRRIGATION PUMP STATION <br /> SECONDARY CLARIFIER NORTH ELECTRICAL ROOM POND RECIRCULATION STRUCTURE <br /> repairs to existing floating digester covers; HVAC equipment. <br />