My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 2000-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
SITE INFORMATION AND CORRESPONDENCE 2000-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:48:15 AM
Creation date
9/26/2019 8:34:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2000-2018
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT 1 4 2008 *NORITHEERN <br /> BLIC AGENCY <br /> ENVIRONMENT HEALTH ��� <br /> RNIA POWER AGENCY <br /> PERMIT/SERVICES <br /> 651 Commerce Drive <br /> Roseville, CA 95678 <br /> (9 16) 781-3636 <br /> www.ncpa.com <br /> October 10,2008 <br /> Adam Freedman <br /> U.S. Environment Protection Agency, Region IX <br /> 75 Hawthorne Street <br /> San Francisco, CA 94105 <br /> Subject: Permit Application for Class 1 Underground Injection Well <br /> Dear Mr. Freedman: <br /> Enclosed is the Northern California Power Agency (NCPA) Underground Injection Control <br /> Permit Application for the STIG-LEC facility. This permit application serves as the <br /> re-application for the existing steam injected gas turbine (STIG)-1 injection well. It also is the <br /> application for the Lodi Energy Center (LEC)-1 injection well to support the LEC. Construction <br /> of the LEC is planned to begin in first quarter 2010. In addition, a third injection well (LEC-2) is <br /> included in the application. It may be drilled in the future to serve as the backup well to both <br /> the existing STIG-1 well and the new LEC-1 well. The existing and proposed injection wells are <br /> defined as Class 1 wells under Title 40 Code of Federal Regulations (40 CFR)Subsection 144.5. <br /> Fluid injection at the STIG-LEC facility would be at a maximum rate of 425 gallons per minute <br /> (gpm). The existing STIG-1 well currently is permitted to inject up to 200 gpm,which is the <br /> same rate assumed in the re-application. The proposed injection rate of the LEC-1 well is <br /> 225 gpm. LEC-2, the proposed backup well,would not operate at a rate higher than 225 gpm <br /> and would serve as a backup well to either STIG-1 or LEC-1 at any given time, but would not <br /> back up both wells concurrently above a rate of 225 gpm.STIG-1 injects into the Domengine <br /> Formation at depths of between 4,234 and 4,507 feet,and the new wells would inject within the <br /> same zone. <br /> The composition of the STIG-1 injectate is expected to remain between 400 and 1,000 mg/L <br /> total dissolved solids (TDS),as it has since the well began routine operation in 2000, unless it is <br /> backing up the LEC-1 well. The composition of the LEC-1 injectate is modeled to be about <br /> 2,186 mg/L TDS. TDS values within the Domengine Formation are approximately 14,000 TDS. <br /> No underground sources of drinking water are expected to be affected by the proposed <br /> injection operations at the STIG-LEC facility. <br /> NCPA and its consultants, CH2M HILL and Worley-Parsons, look forward to working with the <br /> EPA in a manner that will result in a timely issuance of the permit. Our intention is to drill and <br /> test the LEC-1 in fourth quarter 2009, prior to initiating construction at the LEC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.