0 0 <br /> Monitoring Well Installation Work Plan <br /> White Slough Water Pollution Control Facility <br /> Table 6-1. Work Plan Implementation Schedule <br /> Anticipated Completion Date <br /> Task Relative Date CalendarDate <br /> Notify Regional Board that well At least 5 working days prior to construction Fri., Sep. 12, 2014 <br /> construction will begin <br /> Contact USA North At least 48 hours prior to construction Wed., Sep. 17, 2014 <br /> Obtain drilling permit from EHD At least 1 day prior to construction Fri., Sep. 19, 2014 <br /> (needed by the day of construction) <br /> Begin monitoring well construction After completing the tasks listed above Mon., Sep. 22, 2014 <br /> Notify EHD of well seal completion 24 hours prior to completing well seal(a) Mon., Sep. 22, 2014 <br /> Conduct well development 24 hours after well construction(a) Wed., Sep. 24, 2014 <br /> Conduct initial depth and water 48 hours after well development Fri., Sep. 26, 2014 <br /> quality monitoring <br /> Submit Monitoring Well Installation With next quarterly groundwater monitoring To be determined <br /> Report report following receipt of the analytical based on receipt of <br /> results from the initial monitoring event. analytical results <br /> (a) Well construction is assumed to require 2 days. <br /> WEST YOST ASSOCIATES 10 City of Lodi <br /> September 2014 Monitoring Well Installation Work Plan <br /> w\c\213\06-14-31\wp\WP\083014_1 RWP <br />