My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:45:10 AM
Creation date
9/26/2019 8:41:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Monitoring Well Installation Work Plan <br /> White Slough Water Pollution Control Facility <br /> Table 6-1. Work Plan Implementation Schedule <br /> Anticipated Completion Date <br /> Task Relative Date CalendarDate <br /> Notify Regional Board that well At least 5 working days prior to construction Fri., Sep. 12, 2014 <br /> construction will begin <br /> Contact USA North At least 48 hours prior to construction Wed., Sep. 17, 2014 <br /> Obtain drilling permit from EHD At least 1 day prior to construction Fri., Sep. 19, 2014 <br /> (needed by the day of construction) <br /> Begin monitoring well construction After completing the tasks listed above Mon., Sep. 22, 2014 <br /> Notify EHD of well seal completion 24 hours prior to completing well seal(a) Mon., Sep. 22, 2014 <br /> Conduct well development 24 hours after well construction(a) Wed., Sep. 24, 2014 <br /> Conduct initial depth and water 48 hours after well development Fri., Sep. 26, 2014 <br /> quality monitoring <br /> Submit Monitoring Well Installation With next quarterly groundwater monitoring To be determined <br /> Report report following receipt of the analytical based on receipt of <br /> results from the initial monitoring event. analytical results <br /> (a) Well construction is assumed to require 2 days. <br /> WEST YOST ASSOCIATES 10 City of Lodi <br /> September 2014 Monitoring Well Installation Work Plan <br /> w\c\213\06-14-31\wp\WP\083014_1 RWP <br />
The URL can be used to link to this page
Your browser does not support the video tag.